My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-125 J-U-B
>
Meetings
>
2026
>
07. July
>
2026-07-21 10:00 AM - Commissioners' Agenda
>
2026-125 J-U-B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2026 9:35:26 AM
Creation date
8/11/2026 9:35:20 AM
Metadata
Fields
Template:
Meeting
Date
7/21/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution Authorizing the Chair’s Signature on Task Order 2026-01 with J-U-B Engineering to Perform Construction Support Services for the Bowers Field Hangar Taxilane Complex – Phase 1 Design.
Order
7
Placement
Consent Agenda
Row ID
146685
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c <br />B. Organize and conduct weekly construction meetings with CLIENT, Contractor and others as- <br />ap[ropriate. The Resident Prolect Representative will hold these meetings on the construction site' <br />g. provide one full-time project representative to monitor and document construction activities as <br />appropriate. lt is anticipaied ttrai .l-U-e will provide a Reside-nt Project Representative for a period <br />oi bZ worXing days at 10 hours per day plus 5 hours a week for drive time and 39 nights of lodging' <br />tn addition, the Project Manager will visit the site once a week (13 visits) for 3 hours each visit plus <br />5 hours of drive time to provide construction review. <br />10. provide office administration support and assistance to the Resident Project Representative with <br />the Project Manager or Office Administration as field activities may require' <br />'11..1-l-l-B shall receive ancl review the Contractor's monthly requests for payment' J-U-B shall <br />determine whether the amount requested reflects the progress of the Contractor's work and is in <br />accordance with the contract for construction. <br />12. Monitor and coordinate Contractor Quality Control Testing Program pursuant lo-current FAA <br />specifications for Quatity Control and Quality Assurance. lt is anticipated that J-U-B will monitor <br />and test for Quality A.rutan." testing on asphalt placement only, through the use of a <br />subconsultant. Fees for the Geotechnicil Testing Firm Subconsultant shall be reflected in the <br />"subconsultant" line below. <br />13. The pavement contract on this project is expected to exceed $500,000; as such a Quality Control <br />(aCj/ auatity Assurance (AA) Workshop shall be conducted by the ENGINEER in accordance with <br />the latest version of AC 1'50/5370-12. This workshop is anticipated to be conducted virtually. <br />14. Assist CLIENT with review of Contractor Wage and EEO documentation review. Conduct Wage <br />interviews with Contractor personnel as required. <br />15. Coordinate with CLIENT and FAA throughout the construction process Submit required <br />construction documentation, including weekty activity report forms, mix designs, change orders, <br />etc. Coordinate with CLIENT and FAA verbally concerning change orders, as required. <br />16. prepare Contract Change Order/Supplemental Agreements in accordance with FAA Order <br />5100.3gD-Appendix U. Conduct services associated with evaluation, negotiation, and preparation <br />and processing of Contract Change Orders or Supplemental Agreements. Cost estimate is based <br />on the production of two Change Orders. <br />17. Conduct final and substantial completion inspections. The apron project will be constructed in two <br />phases. With the completion of each phase a substantial. completion and punch list will be <br />performed. Therefore, two substantial completions and a combined final completion will take place <br />during the project. Produce substantial and final completion inspection certificates and field review <br />and documentation of "punch list" items. <br />1B- prepare Record drawings of "As Constructed" revisions to Design and Construction Drawings for <br />project improvements Js provided by the 'contractor. Provide CLIENT and FAA with copies of <br />ifecorO Drawings and one electronic copy to be submitted to the FAA as required. Provide CLIENT <br />with one set of prints of Record Drawings. <br />Subtask 003: Project Closeout Phase <br />L prepare the final project report and close-out documents according to FAA requirements and <br />submit to CLIENT and FAA. <br />2. prepare an Airport Layout Plan Set (ALP) Revision to document improvements. A draft copy of the <br />revised ALp will be submitted to the FAA and CLIENT for review. Upon review and comment <br />changes, copies with be distributed to the FAA and CLIENT for signatures' <br />3- Report Disadvantaged Business Enterprise (DBE) project participation to FAA dbE-Connect <br />inciuding all calculaiions and background information for review and approval. <br />4. Assist and coordinate with independent auditors in locating appropriate documents for performing <br />A-133 annual audit. ln addition to finding appropriate project files, answer questions as required' <br />Page 3
The URL can be used to link to this page
Your browser does not support the video tag.