Laserfiche WebLink
Exhibit B: SchooL'to-Work Student Guide lnstructions <br />ThefottowingisabittingguidefortheContractorastheyworkwithstudentsbyfot|owingthepagesofthe <br />student Guide. As the fottowing sections are completed' the contractor witt use Exhibit E: sTw Bitting <br />Checktist for Student Guide, provided to the Contractor by DVR' <br />These instructions witt supportguidanceto schoot-to-work (sTw) contractors as theywork with students <br />whoareparticipatinginsTW.TobegintheprocessofsTWandtoreviewtheSTwStudentGuide'schedulea <br />STWlntakeandAssessmentmeetingwiththestudentandtheStudent'sTearn.Duringthismeeting,the <br />sTWStudent Guide witt be shared with the student, goingthrough the process of sTW and what the student <br />shoutd expect in their f inat year of Transition <br />Bitting lnstructions: <br />1. Bitt $2,000 for the sTW lntake Meeting once the fottowing pages are complete: <br />r Team Buitding and lnformation <br />r Team Contacts, Rotes, and Responsibitities <br />2. Bitt $3,000 for Assessment once the fotLowing pages are complete: <br />Assessment pages may inctude the fotlowing pages being compteted' as appticabte for the student' as <br />each student mayget to their emptoyment go;iin1n"i' own way' Alt sources of information may be used to <br />determine the parts of the assessment' rnis may inctude iob shadows' a Job Foundation Report through <br />DDCs,workBasedLearningthroughPre-ETS,o'unysollrcetodeterminetheneededinformationto <br />establ'ishanemptoymentgoat,Thestudentandthestudent,steamwittworktogethertodeterminethis. <br />The main goat for this section is to get to an emptoyment goat and the next steps for the student ' <br />. STWAssessment <br />r Job Goal <br />r Next StePs and Team Actions <br />3. Bitt $1 ,000 f or the Job seeker Tools once the f oLtowing pages are comptete: <br />r Job Seeker Toots (determined bythe student's team and have been completed and shared with the <br />student and DVR) <br />4. Bitt $2,000 for the Job Offer once the fottowing page is complete: <br />rJobofferDetaitsonthepagetitted,.YouwereofferedthejoblWaytogo!,, <br />5.Bitl,$1,000forEmpl'oymentVerificationoncethefotl.owingpageiscomplete: <br />rFormiscomptetedonthepagetitted,,Congratulations,youareemployed|,, <br />6. Bitt $5,000 lor Stabitization once the fotl'owing pages are complete: <br />Your SuPPorts on the Job <br />Job Stabitization RePort <br />Ptease note there are additionat pages in the student Guide that do not affect the above payments <br />a <br />and are intended to support the student'