My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Agreement (2)
>
Meetings
>
2026
>
07. July
>
2026-07-07 10:00 AM - Commissioners' Agenda
>
Fully Executed Agreement (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2026 9:11:31 AM
Creation date
8/11/2026 9:11:05 AM
Metadata
Fields
Template:
Meeting
Date
7/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve the DSHS/DVR School to Work Direct Service Pilot Contract
Order
13
Placement
Consent Agenda
Row ID
146084
Type
Agreement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B: SchooL'to-Work Student Guide lnstructions <br />ThefottowingisabittingguidefortheContractorastheyworkwithstudentsbyfot|owingthepagesofthe <br />student Guide. As the fottowing sections are completed' the contractor witt use Exhibit E: sTw Bitting <br />Checktist for Student Guide, provided to the Contractor by DVR' <br />These instructions witt supportguidanceto schoot-to-work (sTw) contractors as theywork with students <br />whoareparticipatinginsTW.TobegintheprocessofsTWandtoreviewtheSTwStudentGuide'schedulea <br />STWlntakeandAssessmentmeetingwiththestudentandtheStudent'sTearn.Duringthismeeting,the <br />sTWStudent Guide witt be shared with the student, goingthrough the process of sTW and what the student <br />shoutd expect in their f inat year of Transition <br />Bitting lnstructions: <br />1. Bitt $2,000 for the sTW lntake Meeting once the fottowing pages are complete: <br />r Team Buitding and lnformation <br />r Team Contacts, Rotes, and Responsibitities <br />2. Bitt $3,000 for Assessment once the fotLowing pages are complete: <br />Assessment pages may inctude the fotlowing pages being compteted' as appticabte for the student' as <br />each student mayget to their emptoyment go;iin1n"i' own way' Alt sources of information may be used to <br />determine the parts of the assessment' rnis may inctude iob shadows' a Job Foundation Report through <br />DDCs,workBasedLearningthroughPre-ETS,o'unysollrcetodeterminetheneededinformationto <br />establ'ishanemptoymentgoat,Thestudentandthestudent,steamwittworktogethertodeterminethis. <br />The main goat for this section is to get to an emptoyment goat and the next steps for the student ' <br />. STWAssessment <br />r Job Goal <br />r Next StePs and Team Actions <br />3. Bitt $1 ,000 f or the Job seeker Tools once the f oLtowing pages are comptete: <br />r Job Seeker Toots (determined bythe student's team and have been completed and shared with the <br />student and DVR) <br />4. Bitt $2,000 for the Job Offer once the fottowing page is complete: <br />rJobofferDetaitsonthepagetitted,.YouwereofferedthejoblWaytogo!,, <br />5.Bitl,$1,000forEmpl'oymentVerificationoncethefotl.owingpageiscomplete: <br />rFormiscomptetedonthepagetitted,,Congratulations,youareemployed|,, <br />6. Bitt $5,000 lor Stabitization once the fotl'owing pages are complete: <br />Your SuPPorts on the Job <br />Job Stabitization RePort <br />Ptease note there are additionat pages in the student Guide that do not affect the above payments <br />a <br />and are intended to support the student'
The URL can be used to link to this page
Your browser does not support the video tag.