Laserfiche WebLink
4. <br />5. <br />d. To document compliance with the National lncident Management System (NIMS), the <br />Subrecipient shall complete the annual NIMS survey conducted by Washington <br />Emergency Management Division (EMD). <br />NIMS COMPLIANCEa. The National lncident Management System (NIMS) identifies concepts and principles that <br />answer how to manage emergencies from preparedness to recovery regardless of their <br />cause, size, location, or complexity. NIMS provides a consistent, nationwide approach and <br />vocabulary for multiple agencies or jurisdictions to work together to build, sustain, and <br />deliver the core capabilities needed to achieve a secure and resilient nation. <br />b. Consistent implementation of NIMS provides a solid foundation across jurisdictions and <br />disciplines to ensure effoctive and integrated preparedness, planning, and response. <br />NIMS empowers the components of the National Preparedness System, a requirement of <br />Presidential Policy Directive B, to guide activities within the public and private sector and <br />describes the planning, organizational activities, equipping, training, and exercising <br />needed to build and sustain the core capabilities in support of the National Preparedness <br />Goal. <br />c. ln order to receive federal preparedness funding from the Department, the Subrecipient <br />must ensure and maintain adoption and implementation of NIMS. See Agreement <br />Attachment A, Article ll section 3.c. for associated reporting requirements. The list of <br />objectives used for progress and achievement reporting can be found at <br />https://www.fema.qov/emergencv-managers/nims/implementation-training. <br />d. FEMA requires phased implementation of the National Qualification System (NQS) for <br />EMPG subrecipients. The NQS lmplementation Objectives reflect the concepts and <br />principles contained in NQS doctrine and aim to promote consistency in NQS <br />implementation nationwide. Subrecipients will be considered in compliance with NQS <br />requirements as long as they are working towards implementing the NQS lmplementation <br />Objectives which can be found at <br />https://www.fema.oov/sites/defaulUfiles/documents/fema nims-nqs-implementation- <br />obiectives fact-sheet.pdf. Only EMPG-funded deployable personnel (determined by the <br />Subrecipient) will be required to meet NQS certification requirements. <br />For 25EMPG NQS Phase 3 of implementation, Subrecipients must: <br />i. Execute NQS lmplementation Plan, revising as necessary' <br />ii. Work towards issuing Position Task Books to designated deployable personnel. <br />iii. Ensure designated deployable personnel show progress in working toward <br />Position Task Book completion and meet the minimum training requirements for <br />their job title/position qualifl cation. <br />iv. Track qualification, certification and credentialling for deployable personnel. <br />v. Describe the status of implementation as a part of the annual NIMS survey <br />conducted by EMD staff at the end of the calendar year' <br />EQUIPMENT AND SUPPLY MANAGEMENT <br />a. The Subrecipient and any subrecipient to which the Subrecipient makes a subaward shall <br />comply with 2 CFR 200.317 through 200.327, and all Washington State procurement <br />statutes, when procuring any equipment or supplies under this Agreement, 2 CFR 200.313 <br />for management of equipment, and 2 CFR 200.314 for management of supplies, to <br />include, but not limited to: <br />i. Upon successful completion of the terms of this Agreement, all equipment and <br />supplies purchased through this Agreement will be owned by the Subrecipient, <br />or a recognized subrecipient to which the Subrecipient has made a subaward, <br />for which a contract, subrecipient grant agreement, or other means of legal <br />transfer of ownership is in Place. <br />DHS.FEMA-EMPG-FY25 Page 5 of 50 Kittitas Cou nty, E26-241