My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
StffRrpt_Resolution_Exhibit A_Exhibit B_Exhibit C 07282026
>
Meetings
>
2026
>
08. August
>
2026-08-04 2:00 PM - 2:00pm Public Hearing
>
StffRrpt_Resolution_Exhibit A_Exhibit B_Exhibit C 07282026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2026 12:09:14 PM
Creation date
7/30/2026 12:06:36 PM
Metadata
Fields
Template:
Meeting
Date
8/4/2026
Meeting title
2:00pm Public Hearing
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Public Hearing to extend the Moratorium on Transfer of Development Rights for One (1) Year.
Order
1
Placement
2:00pm Public Hearing
Row ID
147067
Type
Hold Public Hearing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Department of Commerce: Submittal ID 2026-S-11466 <br />lands. A TDR section will help emphasize the TDR program's goals and how the County's program <br />operates. <br />Documenting fulfilment of requirements for infrastructure, facilities and services: <br />We advise the County to consider adding detailed to introductions and expand upon policies within the <br />Transportation Element and Capital Facilities Plan Element. We recommend the introductions summarize <br />overall revenue forecasts, how closely forecasts align with the element's projected needs and outline the <br />coordination involved in addressing (current and future) service impacts and revenue shortfalls and other <br />details addressing minimum requirements under RCW 36.70A.070 3 and RCW 36.70A.070(4}.10 <br />Transportation Policy 20 (T-P20) under Section 5.5.4 and Section 5.7.1 each briefly discuss revenue <br />shortfalls affecting transportation services, but we recommend more detail here. We also advise providing <br />similar information to fully address this within the Capital Facilities Plan Element. As you consider <br />revisions, we encourage you to provide a level of detail which identifies whether the County's current <br />utilities, facilities and services are sufficient to serve the existing and projected growth within and outside <br />of cities and UGAs. <br />We recognize that certain appendices offer additional information relevant to these suggestions, but <br />integrating more detail directly within the comprehensive plan's elements will better demonstrate <br />fulfillment of minimum requirements for these elements.'' Where retaining appendices, cite pages and <br />specific sections to help readers locate the relevant information more easily. Revisions such as these will <br />help Kittitas County highlight fulfillment of GMA requirements as well as provide a stronger record of <br />past and ongoing coordination with service providers. <br />Planning for energy production and storage: <br />We suggest amending Utilities Policy 24 (U-P24) to include a study or studies for each type of energy <br />production facility listed under Utilities Goal 7 (U-G7). We also recommend referring to energy storage <br />systems (ESS) in addition to or instead of battery storage, since the energy sector has evolved to include <br />battery storage as well as other forms of storage technologies. These changes would improve what we <br />already recognize as a pragmatic policy that takes an analytical approach to building the community's <br />long-term resilience. <br />Strengthening the Transportation Element and eliminating duplicative sections: <br />We advise the County review and consolidate Appendix I into the Transportation Element (Chapter 5). <br />Integrating a substantial portion of the content from Appendix I into Chapter 5 would strengthen the <br />Transportation Element and the comprehensive plan, overall. <br />Although Appendix I is titled Transportation Data, its structure, contents, and vision statement within the <br />introduction identify this as a transportation element rather than strictly supplemental data. Appendix I <br />appears to be a Transportation Element from an earlier version of the County's comprehensive plan <br />Including this in its current form increases the County's risk of adopting a plan with duplicative, outdated <br />or conflicting components. <br />Both Chapter 5 and Appendix I contain visions and purpose statements that indicate, "this Transportation <br />Element aims to provide a 20-year vision for the County's transportation system," although only Chapter <br />5 revises the timeframe from 2038 to 2048. Since RCW 36.70A.130 requires a 20-year planning horizon, <br />we recommend removing the word "aims" to emphasize the County's fulfillment of the statutory intent <br />and ensure that all timeline references are consistent with the updated planning timeframe. <br />Whether retaining these distinct transportation sections or consolidating the best qualities of both into <br />Chapter 5, carefully verify that all transportation content accurately reflects updated existing conditions <br />and covers the current 20-year planning horizon. <br />Thank you for providing this opportunity to comment and we hope this input will be useful in the <br />County's efforts. As a general reminder, copies of adopted plans and regulations shall be submitted to <br />10 See WAC 365-196 (365-196-400 through 440) for procedural criteria corresponding to RCW 36.70A.070. <br />" See WAC 365-196 (365-196-400 through 365-196440) to review codified procedural criteria for these elements. <br />Page: 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.