Laserfiche WebLink
A.ssr-.1inpticns <br />r Soit sampling and laboratory analysis will be performed and paid for directly by the County through their <br />selected contractor and laboratory. <br />. Rangeland specialist services will be provided under this contract as a Parametrix subcontractor' <br />r Application events willfollow the approved SSLAP procedures unless Ecology requires modifications. <br />r Parametrix is not responsible for field application oversight or contractor performance. <br />r Rcrutine SFI inspertions, maintenance, freeboard checks, lysimeter monitoring, sediment sampling, and <br />recordkeeping are performed by the County and are not included in this task. <br />r Any SEL technical support beyond the scope of Land Application Event planning will be addressed under <br />Task 4.0 - Necessary on-call civil Engineering and Environmental Design services or as a separate task, <br />at the County's discretion. <br />r This task covers work performed under the 2025 Ecology General Permit for Biosolids Management and <br />associated SSLAP approval. Any scope required to implement future permits or revised SSLAPs will be <br />addressed under a separate task or contract amendment' <br />Task 5.0 - On-Cail Services <br />0bjective <br />provide as-needed engineering, environmental, and permitting supportfor regulatory, operational, and <br />technical needs at the Ryegrass Facility that fall outside the defined annual scope of Tasks 1'0 through 3.0' This <br />task covers occasional or contingent work that is only performed upon County request and authorization, and is <br />intended to address evolving facility priorities, regulatory changes, or unforeseen conditions. Below are three <br />known subtasks that will be executed during this contract, but the timing, budge! and full scope of each will be <br />determined as the work is authorized. Additional subtasks may also be added during the contract term. <br />Subtask 5,1 - LFl, Closure <br />Activities <br />Activities may include, but are not limited to: <br />o Preparation of 90% design and permit documents for closure. <br />. Coordination with Ecology for closure approvals' <br />e Development of a closure phasing plan for cover system installation (schedule to be determined) <br />. Construction management and certification of closure. <br />Subtask 5.2 -- New Leachate Evaporation Pond <br />Activities <br />Activities may include, but are not limited to: <br />o Siting and design of a new leachate evaporation pond downstream of the landfill' <br />Kittitas County Agreement for Services (rev' 5h4/25ll <br />Page 10 of 28