Laserfiche WebLink
Project: Kittitas Jail <br />205 W 5th Ave <br />Ellensburg, WA 98926 <br />Page 1 of 1 <br />POTENTIAL CHANGE ORDER <br />TO: Scott Carlson Date: 6/11/2026 <br />Contractor Belsaas and Smith Change # 8 <br />- Amount: $680.40 <br />Initiated By: Titan Electrical <br />FROM: Charles Espinoza Reason: Unforeseen Conditions <br />Subcontractor Titan Electrical LLC Type: Additive - Lump Sum <br />CHANGE TITLE PCO8 Added Receptacle in Vestibule E109 <br />THIS CONTRACT WILL BE MODIFIED AS FOLLOWS: <br />Install (1) duplex receptacle in vestibule E109 from nearest existing power in ceiling space <br />Cost Breakdown This Change: Contract Revision Summary: <br />Labor $500.00 Original Contact <br />Material $67.00 Prior Approved Changes <br />Other $0 Contract After Changes <br />O&P $113.40 This Change <br />Total $680.40 Total Contract to Date <br />Authorized By: Accepted By: <br />CONTRACTOR SUBCONTRACTOR <br />Signature: Signature: <br />Print Name: Print Name: <br />Title: Title: <br />Date: Date: <br />Docusign Envelope ID: A8A8B714-EAE8-8064-8123-710DB1F2CD3C