Laserfiche WebLink
BELSAAS & SMITH CONSTRUCTION <br />SHEET 2 of 2 C.O.P. #25 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br />EQUIP SUB MATERIAL LABOR <br />COST COST COST COST <br />TOTALS FROM PREVIOUS PAGE -$ 7,605.40$ -$ 1,020.00$ <br />OVERHEAD 3%-$ 228.16$ -$ 30.60$ <br />PROFIT 10%-$ 783.36$ -$ 105.06$ <br />BONDING 1.5%-$ 129.25$ -$ 17.33$ <br />SUB TOTAL -$ 8,746.17$ -$ 1,172.99$ <br />SUB TOTAL -$ 8,746.17$ -$ 1,172.99$ <br />LABOR 1,172.99$ <br />MATERIAL -$ <br />EQUIPMENT -$ <br />SUBCONTRACTORS 8,746.17$ <br />SUB TOTAL SUB TOTAL 9,919.17$ <br />PREVIOUS CO ALLOWANCE <br />GRAND TOTAL TOTAL 9,919.17$ <br />TIME EXTENTION REQUIRED: 98 Days <br />NOTICE TO PROCEED REQUIRED BY: <br />WE RESERVE OUR RIGHTS UNDER THE CONTRACT TO ACCESS THIS CHANGE <br />CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT. <br />Docusign Envelope ID: A8A8B714-EAE8-8064-8123-710DB1F2CD3C