Laserfiche WebLink
BELSAAS & SMITH CONSTRUCTION <br />SHEET 2 of 2 C.O.P. #24 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br />EQUIP SUB MATERIAL LABOR <br />COST COST COST COST <br />TOTALS FROM PREVIOUS PAGE 300.00$ 108,258.00$ 3,874.00$ 13,464.00$ <br />OVERHEAD 3%9.00$ 3,247.74$ 116.22$ 403.92$ <br />PROFIT 10%30.90$ 11,150.57$ 399.02$ 1,386.79$ <br />BONDING 1.5%5.10$ 1,839.84$ 65.84$ 228.82$ <br />SUB TOTAL 345.00$ 124,496.16$ 4,455.08$ 15,483.53$ <br />SUB TOTAL 345.00$ 124,496.16$ 4,455.08$ 15,483.53$ <br />LABOR 15,483.53$ <br />MATERIAL 4,455.08$ <br />EQUIPMENT 345.00$ <br />SUBCONTRACTORS 124,496.16$ <br />SUB TOTAL SUB TOTAL 144,779.77$ <br />PREVIOUS CO ALLOWANCE <br />GRAND TOTAL TOTAL 144,779.77$ <br />TIME EXTENTION REQUIRED: 84 Days from door submittal approval <br />NOTICE TO PROCEED REQUIRED BY: <br />WE RESERVE OUR RIGHTS UNDER THE CONTRACT TO ACCESS THIS CHANGE <br />CUMULATIVELY AS IT AFFECTS TIME AND AMOUNT. <br />Stairs (add $23,195 + $3,363.28 OH&M) <br />Docusign Envelope ID: 89144F8C-AA3F-80BF-836D-7E5D94EFF238