My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-06-29-minutes-ec-study-session
>
Meetings
>
2026
>
07. July
>
2026-07-07 10:00 AM - Commissioners' Agenda
>
2026-06-29-minutes-ec-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2026 12:49:34 PM
Creation date
7/2/2026 12:46:52 PM
Metadata
Fields
Template:
Meeting
Date
7/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
146084
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�\c <br />L5 <br />k R[H I-EQ 15 <br />REQUEST FOR PROPOSAL NO: 11 SPOKANE <br />203 N Washington <br />Project Name: Ellensburg Rodeo Arena Completion Suite 400 <br />Spokane, WA <br />Owner: Kittitas County 99201 <br />P 509 838.8568 <br />Contractor: Cascade Central Construction <br />alscarchitecTs.com <br />Job Number: 2025-009 Page 1 of 4 <br />TO: Cascade Central Construction, Contractor, please furnish your proposal for performing the changes outlined <br />below and/or detailed on the attachments referred to: <br />C-121 — CIVIL SITE PLAN <br />• REVISED: Slab configuration at west entry. <br />C-131 —GRADING PLAN <br />7 REVISED: Slab elevations for new configuration. <br />ALSC Architects P.S. By Todd Keller Date: 5/19/26 <br />PROPOSAL: <br />To the Owner: We propose to perform all changes described in the above request for a total ADDITION/ <br />(cross out one) to the contract sum of: <br />Eight Thousand Seven Hundred Ninety -Seven and 79/100 Dollars s 8,797.79 <br />(not including Sales Tax) <br />We have attached cost estimate detail sheets, and the foregoing amount covers all direct and indirect costs related to <br />this proposal and to the effect of the proposal on the remainder of the project. All other provisions of the contract <br />remain in full force and effect. We request the completion date be EXTEND ED/RE-Bti4E&(cross one out) 0 <br />calendar days because of this work. The Contractor agrees to be bound to this proposal quotation for sixty (60) days <br />after this date. <br />Cascade Central Construction By KC Carroll Date 5/27/2026 <br />Contractor <br />RECOMMENDATION: <br />TO: Owner, we have examined the foregoing proposal and find it to be appropriate for the request. We recommend <br />its acceptance. <br />ALSC Architects P.S. By <br />PROPOSAL ACCEPTANCE: <br />Date: <br />ALSC Architects 11 We bring our clients' stories to life. <br />
The URL can be used to link to this page
Your browser does not support the video tag.