My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2026-06-29-minutes-ec-study-session
>
Meetings
>
2026
>
07. July
>
2026-07-07 10:00 AM - Commissioners' Agenda
>
2026-06-29-minutes-ec-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2026 12:49:34 PM
Creation date
7/2/2026 12:46:52 PM
Metadata
Fields
Template:
Meeting
Date
7/7/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
146084
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Breakdown <br />Project Name: Ellensburg Rodeo Arena Improvments <br />Project No. <br />Contractor: McGann Electric <br />COP-17 <br />Date: 5/22/2026 <br />Contractor Ref. No. <br />Description <br />Quantity <br />Unit <br />Type <br />Labor <br />Material <br />Equipment <br />Total <br />Cost <br />Unit $ <br />Cost <br />Unit $ <br />Cost <br />Unit $ <br />Cost <br />5 <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />�-Electrician <br />Labor <br />51 <br />HR <br />$106.95 <br />$ 5.454.45 <br />$ <br />5 <br />$ 5,454.45 <br />Foreman Labor <br />HR <br />$117.14 <br />$ <br />$ <br />5 <br />$ <br />i <br />$ <br />S <br />$ <br />$ <br />5 <br />$ <br />5 <br />$ <br />$ <br />V$E <br />$ <br />$ <br />$ <br />5 <br />$ <br />$ <br />$ <br />$ <br />5 <br />lbellbox and cover <br />1 <br />EA <br />$ <br />$19.50 <br />5 19.50 <br />$ <br />$ 19.50 <br />314 emt <br />40 <br />FT <br />$ <br />$1.36 <br />$ 54.40 <br />$ <br />S 54.40 <br />EMTfittings <br />1 <br />LT <br />$ <br />$35.00 <br />$ 35.00 <br />$ <br />S 35.00 <br />hardware <br />1 <br />LT <br />$ <br />$21.00 <br />$ 21.00 <br />$ <br />$ 21.00 <br />terminations <br />1 <br />LT <br />$ <br />$40.00 <br />$ 40.00 <br />$ <br />$ 40.00 <br />THHN <br />120 <br />FT <br />$ M <br />$0.22 <br />$ 2640 <br />$ <br />$ 26.40 <br />18-9 2c WL cable <br />40 <br />FT <br />$ <br />$0.36 <br />$ 14.40 <br />$ <br />$ 14.40 <br />$ <br />$ <br />$ <br />$ <br />Puck lighting, driver, hardware <br />1 <br />LT <br />5 <br />$5,119.60 <br />$ 5,119.60 <br />$ <br />$ 5.119.60 <br />shipping and handling <br />1 <br />LT <br />5 <br />$150.00 <br />$ 150.00 <br />$ <br />$ 150.00 <br />$ <br />5 <br />$ <br />$ <br />$ <br />S <br />$ <br />$ <br />Labor Subtotal <br />$ 5,454.45 <br />$ <br />$ <br />5 <br />$ <br />$ <br />$ <br />$ <br />$ <br />Subtotal Cost of <br />Work <br />2112017 <br />$ 5,454.45 <br />$ 5,480.30 <br />$ <br />$ 10,934.76 <br />htlps://mcgannelecldc-my sharepoint com/pemonaUackmcgann_mcgannelectdc_com/Documents/McGann EhEMBrdW2EoF&nsburg Rodeo 9 30/COPS/COP 17 additional puck IighM1ng/Ellensburg Rodeo PIV Valve COOifeM 5252026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.