Laserfiche WebLink
r <br /> S ELLAN 0 <br /> C O N S T R LJ C T 1 O N <br /> G` 1-1 Daily Report of Force Account Worked <br /> Contract Number Date Item Number Item Name <br /> 512012026 RFP 11 <br /> Prime Contractor Subcontractor/Lower Tier Subcontractor <br /> Cascade Central Construction Selland Construction,Inc. <br /> Description of Work Performed <br /> RFP 11 Re-Grading and Concrete Prep(991 SF added) <br /> Time Worked Record <br /> Workers and/or Equipment Hours Worked <br /> Working Occupation of Workers or Equipment Size Reg Reg.Rate Amount <br /> Labor <br /> 1 Foreman 10.0 $102.61 $1,026.10 <br /> 2 Operator 10.0 $100.07 $1,000.70 <br /> 3 Operator $100.07 $0.00 <br /> 4 Operator $100.07 $0.00 <br /> 5 Operator $100.07 $0.00 <br /> 6 Operator $100.07 $0.00 <br /> 7 Operator(Roller) $94.82 $0.00 <br /> 8 Pipe Layer $66.07 $0.00 <br /> 9 Pipe Layer $66.07 $0.00 <br /> 10 General Laborer 10.0 $62.45 $624.50 <br /> 11 $0.00 <br /> Labor Subtotal $2,651.30 <br /> 15% Markup $397.70 <br /> Labor Total $3,049.00 <br /> Equipment <br /> 12 238 Excavator $137.12 $0.00 <br /> 13 138 Excavator $124.46 $0.00 <br /> 14 Loader 5.0 $84.33 $421.65 <br /> 15 Mini Excavator 5.0 $56.10 $280.50 <br /> 16 Skid Steer 5.0 $80.18 1 $400.90 <br /> 17 Roller $25.32 $0.00 <br /> 18 Pickup $43.80 $0.00 <br /> 19 1-Ton 10.0 $47.22 $472.20 <br /> Equipment Subtotal $1,575.25 <br /> 15% Markup $236.29 <br /> Equipment Total $1,811.54 <br /> Materials <br /> 20 $0.00 <br /> 21 Crushed Rock 35 TN $16.00 $560.00 <br /> 22 $0.00 <br /> 23 $0.00 <br /> 24 $0.00 <br /> 25 $0.00 <br /> 26 $0.00 <br /> 27 $0.00 <br /> 28 $0.00 <br /> Materials Subtotal $560.00 <br /> 15% Markup $84.00 <br /> Materials Total $644.00 <br /> Calculated By jDate Checked By IDate <br /> Total $5,504.53 <br />