Laserfiche WebLink
RFP#11- Lower Level Slab <br /> RFP 11 - Concrete Estimate <br /> JOO 011 , <br /> � 1 Estimate Date: 5/27/2026 <br /> CUNCRETE,�`�E�XC,,,,�i�Y�i►T�IUN <br /> Project <br /> Ellensburg Rodeo Improvements <br /> ATTN:General Contractor Project Location <br /> Ellensburg, <br /> Washington <br /> Item Work Description Class Quantity Unit Unit Price Amount(US$) <br /> 1 Ready Mix Concrete-450OPSI(Includes 10%Spillage) Material 5 CY $210.75 $1,053.75 <br /> 2 #4 Rebar-Stock 20'Length Material 18 EA $11.86 $213.48 <br /> Screws,Saw Blades,Nails,Bits,Rebar Tie Wire,MAX <br /> 3 Rebar Tie Gun,Sprayer,Curing Compound,Form Oil, Tools 1 LS $130.00 $130.00 <br /> Impact Gun,Skill Saw,Etc. <br /> 4 Ironworker Labor 4 HR $86.56 $346.24 <br /> 5 Cement Mason Labor 11 HR $65.71 $722.81 <br /> 6 Per Diem&Lodging Labor 2 EA $225.00 $450.00 <br /> Jones Concrete&Excavation <br /> Customer: <br /> Estimator-Carson Chester <br /> Authorized Signature: 541-861-8060 <br /> Name: Sub Total $2,916.28 <br /> Date of Acceptance: <br /> 0&P Markup $0.00 <br /> TOTAL $2,916.28 <br /> www.JonesConcrete.pro 1/1 <br />