Laserfiche WebLink
-75 HN_*LAhl f,){: r: N $-rsQ t,! {:fI {:l b{ <br />Daily Report of Force Account Worked <br />Contract Number lDateI trrrrtoru <br />Item Number liem Name <br />(ltilities in HardscapeAreas Subexc & Structural Fill <br />Prime Contractor Subcontractor/Lower Tier Subcontractor <br />Selland Construction, IncCascade Central Construction <br />Description of Work Performed <br />Utilities in Hardscape Areas Subexc & Structurul Fill <br />Time Record <br />Workers and/or Equipment <br />Working Occupation of Workers or Equipment Size <br />Hours Worked <br />Reg. Rate O.T. Rate Amount <br />Reg.o.T <br />Labor <br />1 Dylon Brown Foreman 6.5 $102.61 8102.61 $666.97 <br />2 Jason Tortes Operator 11.00 8100.07 8100.07 $1,100.77 <br />3 lltill Green Operator 13.0 8100.07 $100.07 81,300.91 <br />4 Tucker Slabach Operator 5.0 $100.07 $100.07 $500.35 <br />E Parker Berman Operator 12.3 8100.07 8100.07 $1,225.86 <br />A Jesus Lopez Operator 12.0 $100.07 $100.07 $I,200.84 <br />7 Operator (Roller)$94.82 $94.82 $0.00 <br />8 Pipe Layer $66.07 s66.07 80.00 <br />o Randy Ramos Pipe Layer 7.0 866.07 $66.07 s462.49 <br />10 Genersl Laborer $62.4s $62.4s $0.00 <br />11 80.00 <br />Labor Subtotal 86,458.I8 <br />15% Itdarkup $968.7 3 <br />Labor Total $7,426.91 <br />12 238 Excavator 8.50 $137.12 81,165.52 <br />13 138 Excavator 8.0 $124.46 $995.68 <br />14 Looder I 5.5 $84.33 $1,307.12 <br />15 Mini Excavator 9.0 $s6.10 $504.90 <br />16 Skitl Steer $80.18 80.00 <br />17 Roller 92s.32 80.00 <br />18 Pickup 6.5 s43.80 $284.70 <br />19 1-Ton 13.0 $47.22 $613.86 <br />Equipment Subtotal $4,87 1.78 <br />15% Markup $7 30.77 <br />Eguipment Total $5,602.54 <br />Materials <br />20 $0.00 <br />21 Str. Fill 325.72 TN st 1.00 83,582.92 <br />22 $0.00 <br />23 $0.00 <br />24 $0.00 <br />25 $0.00 <br />26 $0.00 <br />27 $0.00 <br />28 $0.00 <br />Materials Subtotal 83,582.92 <br />l5ol Markup 8537.44 <br />Materials Total $4,120.36 <br />Calculated By lDate Checked By lDate Total $17,149.81