My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-' <br />-e <br />- <br />.-7 <br />*ELL,&,NT3i: l:j hl E; I t.{ LJ {]-T I [:i r..t <br />Daily Report of Force Account Worked <br />3ontract Number Date <br />3/I/2026 <br />Item Number Item Name <br />Footine Subexcovation & Slructural Fill <br />Prime Contractor Subcontractor/Lower Tier Subcontractor <br />Sellsnd Construction, Inc,Cascade Central Construction <br />Description of Work Performed <br />Offiaul Unsuitable <br />Worked Record <br />workers and/or Equipment <br />Working Occupation of Workers or Equipment Size <br />Hours Worked Reg. Rate O.T. Rate Amount <br />Req.o.T, <br />Labor <br />1 Foreman 10.0 $r02.61 $102.61 $r,026.10 <br />2 Operator 13.5 $100.07 $100.07 81,350.95 <br />3 Operator 8100.07 8100.07 $0.00 <br />4 Operalor $100.07 $100.07 $0.00 <br />5 Operator $100.07 $100.07 80.00 <br />6 Operator $100.07 $100.07 $0,00 <br />7 Operator (Roller)894.82 $94.82 $0.00 <br />8 Pipe Lojer $66.07 866.07 $0.00 <br />o Pipe LaJter $66.07 $66.07 $0.00 <br />10 General Laborer 20.0 $62.4s 862.4s $r,249.00 <br />11 Truck Driver 132.0 $0.00 <br />Labor Subtotal $3,626.05 <br />15% Irlarkup $543.91 <br />Labor Total $4,169.9s <br />Equipment <br />12 238 Excavator $137.12 $0.00 <br />13 138 Excnvalor $124.46 $0.00 <br />14 Loader 13.5 $84.33 $1,138.46 <br />15 Mini Excavutor $s6.r0 $0.00 <br />16 D6 Dozer $r41.60 $0.00 <br />17 Roller 825.s2 80.00 <br />18 Solo Dump Truck $86.80 $0.00 <br />40 Truck & Pup 49.5 8100.2s $4,962.38 <br />20 Trsctor & Side Dump 82.5 $96.5s $7,965.38 <br />21 Pickup 10.0 843.80 $438.00 <br />22 I-Ton 0.0 $47.22 $0.00 <br />Equipment Subtotal $ 14,504.21 <br />15% h,Iorkup $2, I 7s.63 <br />Equipment Total $16,679.84 <br />Materials <br />$0.00 <br />24 $0.00 <br />25 $0.00 <br />26 $0.00 <br />27 $0.00 <br />28 80.00 <br />29 $0.00 <br />30 $0.00 <br />31 $0.00 <br />Materials Subtotal $0.00 <br />15% Markup $0.00 <br />Materials Total $0.00 <br />Calculated By Date By <br />Total $20,849.79
The URL can be used to link to this page
Your browser does not support the video tag.