Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code: <br />Code <br />98-021 <br />Descrintion <br />Totals by individual items <br />Cost Code Review <br />T&M: Trench Backfill Hardscape Ar <br />Class Res. Hours OT Hours Other Hours <br />2533 <br />2541 <br />2545 <br />2559 <br />2566 <br />2582 <br />WLLIAM GREEN <br />PARKER BERMAN <br />JESUS LOPEZ <br />TUCKER SLABACH <br />DYLAN BRO\A/N <br />RANDY RAMOS <br />Totals: <br />350t210131 <br />310 I 210 <br />240 I 350 <br />350 I 210 <br />310 / 810 <br />210 <br />12.00 <br />8.75 <br />12.00 <br />5.00 <br />5.50 <br />7.00 <br />61.25 <br />1.00 <br />3.50 <br />0.00 <br />0.00 <br />1.00 <br />0.00 <br />5.50 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />BH354 <br />BH356 <br />8H391 <br />F8323 <br />LD363 <br />RBH44O <br />RLD4O9 <br />2021Komalsu PC238 Exc <br />2021 Kubota Exc <br />2024 Kubota Mini Excavator <br />2024 RAM 3500 Flatbed <br />2012 CAT 930H Loader <br />JOHN DEER MINI EXCAVA <br />950 Loader <br />Totals: <br />8.50 <br />0.50 <br />2.00 <br />1.00 <br />,10.00 <br />6.25 <br />5.50 <br />41.75 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Aftendance/Non-Use Codes included in Hours: None / None <br />on: <br />Page 11 <br />Date: