Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Cost Code: 98-021 <br />Code Description <br />Cost Code Review <br />T&M: Trench Backfill Hardscape Ar <br />Class Reg. Hours OT llours <br />Job Code: 2550-30 <br />Other Hours <br />Production Quantities: 0.000 <br />2566 DYLAN BRO\A/N <br />2545 JESUS LOPEZ <br />RLD409 950 Loader <br />1136 JASONTORRESVARGAS <br />8H354 2021Komalsu PC238 Exc <br />810 <br />350 <br />310 <br />0.00 <br />2.00 <br />2.00 <br />2.00 <br />2.OO <br />0.50 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0,00 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />4.5 <br />4.0 <br />Matl-Sub-Exp <br />2MFILL <br />Description <br />Fill Material Purchase & Deliv <br />Cost Type <br />M <br />Units Received <br />70.960 <br />Used <br />70.960TN <br />Company Note: <br />lndexes: <br />Inspector Note: Trench backfill in a hardscape area starting elevation of trench is 1573.5 built back up with 57 ft long 3.5 ft wide x4 ft 43.96 ton 25'86 <br />cy <br />East Ada ramp where the water runs under the side walk down grid line land k to grid line 1 and h <br />Grid line f and north of grid line 1 to west of grid line d and north of grid line 1 the slab on the northside of the bar building 35ftx3.5x3'5 <br />27tn 15.88cy <br />Total cubic yards is 41.74 <br />Totaltns is70.96 <br />Total Production Quantity: 81.000 <br />Attendance/Non-Use Codes included in Hours: None / None <br />on: <br />Page 10 <br />13:44:28 <br />Date: