My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Cost Code: 98-021 <br />Code Description <br />Cost Code Review <br />T&M: Trench Backfill Hardscape Ar <br />Class Reg. Hours OT llours <br />Job Code: 2550-30 <br />Other Hours <br />Production Quantities: 0.000 <br />2566 DYLAN BRO\A/N <br />2545 JESUS LOPEZ <br />RLD409 950 Loader <br />1136 JASONTORRESVARGAS <br />8H354 2021Komalsu PC238 Exc <br />810 <br />350 <br />310 <br />0.00 <br />2.00 <br />2.00 <br />2.00 <br />2.OO <br />0.50 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0,00 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />4.5 <br />4.0 <br />Matl-Sub-Exp <br />2MFILL <br />Description <br />Fill Material Purchase & Deliv <br />Cost Type <br />M <br />Units Received <br />70.960 <br />Used <br />70.960TN <br />Company Note: <br />lndexes: <br />Inspector Note: Trench backfill in a hardscape area starting elevation of trench is 1573.5 built back up with 57 ft long 3.5 ft wide x4 ft 43.96 ton 25'86 <br />cy <br />East Ada ramp where the water runs under the side walk down grid line land k to grid line 1 and h <br />Grid line f and north of grid line 1 to west of grid line d and north of grid line 1 the slab on the northside of the bar building 35ftx3.5x3'5 <br />27tn 15.88cy <br />Total cubic yards is 41.74 <br />Totaltns is70.96 <br />Total Production Quantity: 81.000 <br />Attendance/Non-Use Codes included in Hours: None / None <br />on: <br />Page 10 <br />13:44:28 <br />Date:
The URL can be used to link to this page
Your browser does not support the video tag.