Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: EllensburgRodeo Arena Improvements Job Code: 2550-30 <br />Cost Code: <br />Code <br />98-021 <br />Descrintion <br />Cost Code Review <br />T&M: Trench Backfill Hardscape Ar <br />Class Reg. Hours OT Hours Other Hours <br />Production Quantities: 0.000 <br />2533 WILLIAM GREEN <br />1D363 2O12CAT 930H Loader <br />350 0.50 <br />0.50 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />0.5 <br />0.5 <br />Production Quantities: 0.000 <br />2566 DYLAN BROWN <br />BH354 2021Komalsu PC238 Exc <br />2533 WLLIAM GREEN <br />2533 WLLIAM GREEN <br />1D363 2012CAT 930H Loader <br />810 2.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />210 <br />350 <br />0.00 <br />0,00 <br />0.00 <br />0.00 <br />0.00 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />4.0 <br />2.0 <br />Gompany Note: <br />lndexes: <br />lnspector Note: 30 x5x3.5 ft conduit bank running down the center of the east building 4 4 in conduits built up in 3 lifts compacted with the heavy duty <br />dieselPlate <br />Attendance/Non-Use Codes included in Hours: None / None <br />Pinted on: <br />Page 2 <br />13:z14:26 <br />Date: