Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code: <br />Code <br />98-021 <br />Descrintion <br />Cost Code Review <br />T&M: Trench Backfill Hardscape Ar <br />Class Reg. Hours OT Hours Other Hours <br />Production Quantities: 81.000 <br />2566 DYLAN BRO\AN <br />8H354 2021 Komatsu PC238 Exc <br />2582 RANDYRAMOS <br />2533 WLLIAM GREEN <br />1D363 2O12CAT 930H Loader <br />2.00 <br />1.00 <br />2.00 <br />1.00 <br />1.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />310 <br />210 <br />350 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />5.0 <br />2.0 <br />Company Note: <br />lndexes: <br />lnspector Note: Brought in materiel and placed structural fill in hard scape areas northside of the north build from the east side of the clean out <br />closest to the concessions building to the east <br />And the sewer run that runs parallel to the north side of the east building <br />Attendance/Non-Use Codes included in Hours: None / None <br />Pinted on: <br />Page 1 <br />13:zM:26 <br />Date: