Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Print records for all Diary and/or Cost Code Note Entries between 101612025 and31412026 <br />Date Foreman Cost Code Note Index Codes <br />02t12t2026 2566 - DYLAN <br />Attached lmages/Documents <br />98-005 T&M: Overexc. & Rock Placement Footings <br />0.000 TN <br />3Slot: <br />Company Note: <br />lnspector Note <br />02t13t2026 2566 - DYLAN <br />98-005 T&M: Overexc. & Rock Placement Footings <br />0.000 TN <br />2Slot: <br />Company Note: <br />Inspector Note: <br />o2t16t2026 2566 - DYLAN <br />Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br />Ran into some issues with bear passing off our established subgrade from previous exhisting grade. We over excavated the area <br />5x5v21574.2 3.15 ton 1.85cy <br />1 8x1 0x4' 1572.44. 45.33tn 26.67 <br />9x7x 3.5 1573.1113.881n 8.17cy <br />19x20x3.5 1573.11 83.74 ton 49.26 cu yds <br />20x10x3.5 1573.06 44.07tn 25.93 curds <br />7 x1 5x1 57 4.3 13.22tn 7.78 curds <br />6x10x4 1572.75 15.11tn 8.89 cu yds <br />75x32 feet that was over excavated beginning elevation was 1576.80 this area as mucked out at 1575.95 to get rid of that muddy soft surfa' <br />non yielding surface <br />75.56 cy <br />128.4 tons <br />Attached lmages/Documents <br />indicates Selection Choice <br />with Asterisks Printed on:18:50:27 PageA Bolded Note lndex