My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Print records for all Diary and/or Cost Code Note Entries between 101612025 znd 31412026 <br />Date Foreman Cost Code Note Index Codes <br />98-005 T&M. Overexc. & Rock Placement Footings <br />0.000 TN <br />Slot: 4 <br />Company Note: <br />lnspector Note: <br />02fi0t2026 2566 - DYLAN <br />98-005 T&M: Overexc. & Rock Placement Footings <br />0.000 TN <br />Slot 4 <br />Gompany Note: <br />lnspector Note: <br />02t11t2026 2566 - DYLAN <br />98-005 T&M: Overexc. & Rock Placement Footings <br />0.000 TN <br />Slot: 4 <br />Gompany Note: <br />lnspector Note:Qty 7 11x16 ftg holes with a 1.Sbuild <br />50x11 x1.5 <br />2 11x16x4' <br />2 11x16x2 <br />Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br />. The geo engineer determined The soft spots needed to be removed to build on top of <br />We had one at 65'x12' ftom 1574.21 back to the exhisting grade of 1576..5 this was behind the east bathrooms on the concourse deck clos <br />the stadium wall 113tn 66.44cu yds <br />We then over excavated. A second and third muck spot in a location going out the west stairs with a cut of materiel split up into two separa <br />depths. <br />38x20 starting bearing surface elevation starting at 1574.568 <br />This area was at the top of the stairwell covering a surface area <br />51'x16 down to1572.566 this was at the bas of the stairwell heading out towards the west alongside the south side of the west bathroom <br />38x 20x 2.5' soft muck area was backfilled from the over excavation the previous day <br />1574.5681o 1576.670 70 cy 119.6 <br />A second spot was at the ada west ramp was at 51'x16'x2.6' up past the stairway to the deeper overexcavation of muck. <br />1 57 2.566 1o1 575. 037 7 1.93 42.31 <br />2 separate 11x11x2.51571 .5 bearing surface to top of exhisting grade priorto the muck spotwhich was 1576.5. f7 footing pads 30-47 17.9 <br />indicates Selection Choice <br />on: 03/04/2026 18:Page 12Alndex Code with
The URL can be used to link to this page
Your browser does not support the video tag.