My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Print records for all Diary and/or Cost Code Note Entries between L01612025 and 31412026 <br />Date Foreman Cost Code Note Index Codes <br />01t21t2026 2566 - DYLAN <br />98-005 T&M: Overexc. & Rock Placement Footings <br />0.000 TN <br />Slot: 1 <br />Company Note: <br />lnspector Note: <br />01t22t2026 2566 - DYLAN <br />01t26t2026 2566 - DYLAN <br />o1t28t2026 9091 - NIC LOPEZ <br />01t29t2026 2566 - DYLAN <br />02t0212026 2566 - DYLAN <br />Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br />Over excavated a 13x7 spread footing in the corral area and put a 1 foot lift of <br />And over excavated a continues footing of 12'x5f&2'from 1569.5 built back up with base course to 1571.5 <br />Another crew finished over extinguished the interior pad footings in the concourse for when we do place materiel in there we already have , <br />over excavated 2 ft minimum of rock underneath the footings. <br />Bear testing was on site testing concrete on this day so we went ahead and had them proof roll the north buildings first lift. I do believe it is 1 <br />be easing placing conduit on the 1.5 ft minus from finish and backfill the remainder of the buildSng after the plumbing and elenctrical is ins' <br />Attached lmages/Documents <br />Attached lmages/Documents <br />Attached lmages/Documents <br />Attached lmages/Documents <br />indicates Selection Choice <br />wiff Asfer'sks Printed on:18:50:27 Page 10A Bolded Note Index
The URL can be used to link to this page
Your browser does not support the video tag.