My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Print records for all Diary and/or Cost Code Note Entries between 101612025 and'31412026 <br />Date Foreman Cost Code Note Index Codes <br />98-005 T&M: Overexc. & Rock Placement Footings <br />0.000 TN <br />1Slot: <br />Company Note: <br />lnspector Note: <br />01t20t2026 2566 - DYLAN <br />98-005 T&M: Overexc. & Rock Placement Footings <br />0.000 TN <br />Slot: 1 <br />Company Note: <br />lnspector Note <br />Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br />West building <br />We over excavated a7'x5'x4' <br />65'x4'x4.5 cont. <br />3 pad footings 4.6squared all threee were so close together we just excavated all 3 footings being so close together. 16.5' x 5.5'x4 <br />Middle dividing footing of the west building <br />32'x6'x4.5 <br />3 7x7 spread footings in the. Corral area <br />Bearing surface area is 1569.47 so we had to build back up with 1 foot of base course so excavating with concrete forms in mind met a 9'x! <br />Attached lmages/Documents <br />Excavated 3 footings that are 7x7 at 1569.5 to build back up with 1 foot of base coarse the excavations where over dug for concrete form br <br />at 9x9 <br />For the concours area for the f12 and f7 footing call outs The geo tech requested those footings be over excavated 2 feet with an approved <br />mate6el. So being so low on grade and to get the correct obvious of rock underneath the footing we are excavting footings to build up roug <br />between 10 inches we have 7 12xB and27x7 finished <br />indicates Se/ecfion Choice <br />on: 03/04/2026 18:50:27Alndex Code wtfh Asfer'sks 9
The URL can be used to link to this page
Your browser does not support the video tag.