Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Cost Code: 98-005 <br />Code Dasnr.infinn <br />Totals by individual items: <br />Cost Code Review <br />T&M: Overexc. & Rock Placement F TN <br />Class Res. Ilours OT Hours <br />Job Code: 2550-30 <br />Other Hours <br />1867 <br />2453 <br />2499 <br />2559 <br />2566 <br />2582 <br />2.OO <br />2.00 <br />9.50 <br />6.00 <br />12.50 <br />3.00 <br />43.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />RAMIRO RAMIREZ MUNOZ 240 <br />JACOB NEMEC 310 <br />LEVI SHINNERS 810 <br />TUCKERSLABACH 350 <br />DYLAN BRO\A/N 810 <br />RANDYRAMOS 210 <br />Totals: <br />1.00 <br />1.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />2.00 0.00 <br />8H354 <br />LD363 <br />LD374 <br />1D376 <br />2021Komatsu PC238 Exc <br />2O12CAT 930H Loader <br />2020 Komatsu WA380 Load <br />Komatsu WA380 Loader <br />Totals: <br />3.00 <br />6.00 <br />5.00 <br />9.50 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />30.00 0.00 0.00 <br />Attendanc€/Non-Use Codes included in Hours: None / None <br />Pinted on: <br />Page 7 <br />Y Date: