Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code: <br />Code <br />98-005 <br />Descrintion <br />Cost Code Review <br />T&M: Overexc. & Rock Placement F <br />Class Reg. Ilours OT Hours <br />TN <br />Other Hours <br />Production Quantities: 0.000 <br />1136 JASONTORRESVARGAS 350 <br />LD374 2020 Komatsu WA380 Loader <br />1 00 <br />00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Labor Totals <br />Equip Totals <br />Hours - <br />Hours - <br />1.0 <br />1.0 <br />Company Note: <br />lndexes: <br />lnspector Note: Loaded out stockpiled over ex materiel in the arena <br />Total Production Quantity: 0.000 TN <br />Attendanc€/Non-Use Codes included in Hours: None/ None <br />on: <br />Page 6 <br />Date: