Laserfiche WebLink
ftate #co#Amoun <br />Over Excavation & Structural Fill (December)$1 7,065.26 <br />Fiil <br />Over <br />$49.783.49 <br />Over Excavation & Structural Fill (March)$10,747.81 <br />Over Excavation & Structural Fill-Offiaul 920.849.79 <br />Utiliv Trench Sub Exc & Str. Fill in Hardscape Areas s1 7.149.81 <br />Total $164.685.24