My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c <br />P.O. Box 1{9 <br />Wenatchee, WA. 98807-0{ 19 <br />Phone 509-662-7119 <br />Fax 509-662-6380 <br />Coung Comissioners <br />05 West Sth Ave, Suite 108 <br />, wA 98926 <br />MAKE CHECKS PAYABLE TO: <br />Cascade Central Construction, LLC <br />P.O Box 119 <br />Wsnatchee, WA. 98807-01 19 <br />THANK YOU FOR YOUR BUS'IVESS/ <br />PROPOSAL <br />PROJECT: Ellensburg Rodeo Arona lmprovements <br />coP# 33 <br />DATE: April 20, 2026 <br />TITLE: COP 33 - Over Excavation & Structural Fill <br />cfrsclBE <br />EEilTTfiL <br />OaL DESCRtPjIItON ouAr{Tlw uou UMI PRICE ATOUNI <br />4tzot2026 Subcontractor Cost <br />Earthwork Subcontractor - See attached Subcontractor Back-up 1 tS $164,645.24 $164,68s.24 <br />$0.00 <br />$0.00 <br />6% Mark-uF 9_88't.11 <br />Subcontractor - Sub Total '174.566.35 <br />4t20t2026 Cascade Central Construction Cost <br />Supervision 0 HR $124.14 $0.00 <br />General Conditions 0 WD $925.00 $0.00 <br />Project Management & Coordinalion 0 HR $161.54 $0.00 <br />Proiect Engineer HR $116.25 $0.00 <br />Laborer o HR $63.0E $0.00 <br />Carpenter o HR $1 19.00 $0.00 <br />15olo Mark-up 0.00 <br />General Contractor - Sub Total 0.00 <br />subtotal 1 /4-5titt.35 <br />HOnd s1 654 3a <br />ts&o I ax s2 443 93 <br />Schedule lmpact: None, overtime utilized from COP 7. <br />Qualification: lncludes all overexcavation, haul off, and imporuplacement of <br />slructural fill at footings and utilities per direction from GeoEngineers, Baer <br />Testing, and RFI 050 - Utility Trench Backfill Requirements - Response.TOTAL 178.668.66
The URL can be used to link to this page
Your browser does not support the video tag.