Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Cost Code: 98-005 <br />Code I)pccrinfion <br />Cost Code Review <br />T&M: Overexc. & Rock Placement F <br />Class Ree. Hours OT Hours <br />Job Code: 2550-30 <br />TN <br />Other Hours <br />9.5x9.5x3ft <br />4.5x92ft <br />9.5x9.5r2ft <br />10x4.5x2ft <br />9ftx4.5x3ft <br />9.5x9.5f.5ft <br />8ftx4.6x3ft <br />9.5x9.5x1.6 <br />All built of in 6 in lifts with base course <br />Time includes loader operator and removal of excess spoils. To stock pile. <br />Production Quantities: 0.000 <br />2347 ANTONIO SISCO <br />LD363 2012CAT 930H Loader <br />F8317 2023 DODGE RAM 35OO <br />2566 DYLAN BROWN <br />8H354 2021Komatsu PC238 Exc <br />2566 DYLAN BROWN <br />350 <br />810 <br />810 <br />3.00 <br />3.00 <br />3.00 <br />1.00 <br />1.00 <br />3.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />7.0 <br />7.0 <br />Production Quantities: 0.000 <br />2347 ANTONIO SISCO 310 <br />Attendance/Non-Use Codes included in Hours: None / None <br />on: <br />0.50 0.00 0.00 <br />Date <br />0905n026 <br />Page 4