Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Cost Code: <br />Cost Code Review <br />T&M: Overexc. & Rock Placement F <br />Class Res. Hours OT Hours <br />Job Code: 2550-30 <br />98-005 <br />Descrintion <br />TN <br />Code Other Hours <br />lndexes: <br />lnspector Note: 9x9x.5ft <br />9x9x2ft <br />40ftx7x1 <br />15x7fl.ft <br />All of this was the next few lifts on the continuous footing from north building to the west building. <br />Tony had 3 hours moving the rest of the materiel as well as bringing bedding from the stockpile over to the bedding box <br />Production Quantities: 0.000 <br />2347 ANTONIO SISCO <br />1D363 2012CAf 930H Loader <br />F8317 2023 DODGE RAM 35OO <br />2566 DYLAN BROWN <br />8H354 2021Komalsu PC238 Exc <br />2566 DYLAN BROWN <br />2347 ANTONIO SISCO <br />350 <br />810 <br />4.00 <br />4.00 <br />4.00 <br />2.00 <br />2.00 <br />3.50 <br />2.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />11.5 <br />10.0 <br />810 <br />210 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />Gompany Note: <br />lndexes: <br />lnspector Note: Excavated footing on the new location of the stage, <br />We had to over excavate the entire footing area The spread footings that were 7x6 had to be over excavated including the concrete <br />forms Making the base for the footing a 9.-5 squared. And the continues footing that was 2.5 width was over built for forms at 4.5. <br />Footing builds <br />on: 03/05n026 <br />Attendance/Non-Use Codes included in Hours: None / None Page 3 <br />Date: