Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code: <br />Code <br />98-00s <br />T)escrinfion <br />Cost Code Review <br />T&M: Overexc. & Rock Placement F TN <br />Class Res. Ifours OT Hours Other Ifours <br />Production Quantities: 0.000 <br />2347 ANTONIO SISCO <br />LD363 2012CAT 930H Loader <br />1192 JOSHUA SAMPSON <br />2541 PARKERBERMAN <br />8H354 2O2l Komalsu PC238 Exc <br />8H356 2021 Kubota Exc <br />2566 DYLAN BROWN <br />z',t0 <br />310 <br />350 1.00 <br />1.00 <br />3.50 <br />3.50 <br />0.50 <br />3.00 <br />3.50 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00810 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />11.5 <br />4.5 <br />Gompany Note: <br />lndexes: <br />lnspector Note: Time for Tony and the loader removing excess dirt and hauling it off as well as bringing in the rock to build up the .75 up with rock <br />9ftx5ftx9in <br />14ftxSftx9in <br />1Sftx5ftx9in <br />1Oftx5ftx9in <br />All builds are extended past the footing roughly the one foot extension beyond footing edge for a sold base for the footing per the geo <br />request. <br />Attendance/Non-Use Codes included in Hours: None / None <br />Printed on: <br />Page 4 <br />Date: