My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code: <br />Code <br />98-00s <br />T)escrinfion <br />Cost Code Review <br />T&M: Overexc. & Rock Placement F TN <br />Class Res. Ifours OT Hours Other Ifours <br />Production Quantities: 0.000 <br />2347 ANTONIO SISCO <br />LD363 2012CAT 930H Loader <br />1192 JOSHUA SAMPSON <br />2541 PARKERBERMAN <br />8H354 2O2l Komalsu PC238 Exc <br />8H356 2021 Kubota Exc <br />2566 DYLAN BROWN <br />z',t0 <br />310 <br />350 1.00 <br />1.00 <br />3.50 <br />3.50 <br />0.50 <br />3.00 <br />3.50 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00810 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />11.5 <br />4.5 <br />Gompany Note: <br />lndexes: <br />lnspector Note: Time for Tony and the loader removing excess dirt and hauling it off as well as bringing in the rock to build up the .75 up with rock <br />9ftx5ftx9in <br />14ftxSftx9in <br />1Sftx5ftx9in <br />1Oftx5ftx9in <br />All builds are extended past the footing roughly the one foot extension beyond footing edge for a sold base for the footing per the geo <br />request. <br />Attendance/Non-Use Codes included in Hours: None / None <br />Printed on: <br />Page 4 <br />Date:
The URL can be used to link to this page
Your browser does not support the video tag.