My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements <br />Cost Code: <br />Cost Code Review <br />T&M: Overexc. & Rock Placement F <br />Class Res. Ilours OT Hours <br />Job Code: 2550-30 <br />98-005 <br />Descrintion <br />TN <br />Code Other Hours <br />Production Quantities: 0.000 <br />2347 ANTONIO SISCO <br />BH356 2021 Kubota Exc <br />2541 PARKERBERMAN <br />BH356 2021 Kubota Exc <br />2541 PARKERBERMAN <br />1192 JOSHUASAMPSON <br />310 <br />310 <br />210 <br />210 <br />1.50 <br />1.50 <br />3.50 <br />3.50 <br />0.50 <br />4.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Labor Totals: <br />Equip Totals: <br />Hours - <br />Hours - <br />9.5 <br />5.0 <br />Matl-Sub-Exp <br />2MCSBC <br />Description <br />Base Cr <br />CostType <br />M <br />Units Received <br />0.004 <br />Used <br />52.220IN <br />Gompany Note: <br />lndexes: <br />lnspector Note: We had to over excavate a 12ftx4'6x2ft <br />45ftx4'6x8in. <br />45 ftx7ftx8 in. <br />And build back up to grade with base course in lifts to ensure compaction density with a non yielding prodding' <br />All over excavated bullds are built with a 1 foot over build around the perimeter for a solid base for the footing to be set on <br />AttendanceNon-Use Codes included in Hours: None / None <br />on: <br />Page 3 <br />Date:
The URL can be used to link to this page
Your browser does not support the video tag.