Laserfiche WebLink
As cent fuIec fianicaf an[ ePfumfiing Inc <br />COST ESTIMATE DETAIL SHEET <br />Ellensburg Rodeo Arena lmprovements <br />Gontract Cha <br />P.O. Box 38 Rathdrum, lD 83858 <br />Date: 11-May-26 <br />Page 2 of 2 <br />CHANGE PROPOSAL NUMBER: <br />Cast hon Aedit <br />4 <br />CONTRACTOR / NUMBER: <br />TOTAL <br />MATFRTAT l,o"n***"TOTALSize <br />MAT'L UNIT COST <br />lot"l unir |ror.*'o.l uro*DFSCRIPTIONITEM <br />-62 ?A (6 80S 83)-62.20 (6.809.83)1 Cl Credit 1 -6.809.83 <br />3'122 23 49 54 3.122.23PVC Pricind 1 3.122.23 49.542 <br />0003 <br />0.004 <br />0.005 <br />0.006 <br />0.007 <br />0.008 <br />000I <br />0.0010 <br />0.0011 <br />0.0012 <br />0.0013 <br />0.0014 <br />00015 <br />0.0016 <br />0.0017 <br />0.0018 <br />0.0019 <br />0.0020 <br />0.0021 <br />00022 <br />0.0023 <br />0.0024 <br />0.0025 <br />00026 <br />-12.66 $ (3,687.60) <br />0.00 <br />0.00?a <br />00029 <br />00030 <br />0.0031 <br />0.00 $Total: <br />SUBCONTRACTORS <br />32 <br />EA 0.0033 <br />0.0034 <br />0.0035 <br />0.00 $Subcontractor Total: <br />Labor Total -12.66 <br />$ (3,687.60)Material Total <br />EXCLUSIONS: