My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ascent *lechan:icaf on[ gfuntbing Inc <br />COST CHANGE PROPOSAL <br />TO:KC Carroll Date: 11-May-26 <br />Cascade Central Gonstruction <br />1285 SD. Wenatchee Ave, <br />Wenatchee, WA 99807-0119 Phone: 509-662-71 10 <br />Project:Ellensburo Rodeo Arena nts <br />Request No <br />Fax No <br />Our Job No. <br />Our CCP No <br />509-662-6380 <br />352 <br />Fixed Price <br />004 <br />E <br />Scope of Work: <br />T&M <br />Cast kon Credit <br />Cost Plus X <br />LaborHours -12.66 hours @ _$ 100.,11- perhour = E <br />Sickleave @hours @ _L- <br />Labor Burden <br />lnsurance Jhours @ -$- Perhour = g <br />Travel Time 0.00 Hr x Rate $ - per hour = <br />Total Labor Cost: <br />Materials & Supplies $ <br />Anticipated Escalation 0o/o <br />Small Tools <br />Welder hours @ $ 40.00 Per hour = E <br />Tool & Equipment Rentals <br />Total Material & Equipment Gost: <br />Estimation, Manager Review & Administrative Costs ( $108.91 / hr) <br />Supervision Labor Costs (15% of labor) ( ) 0% <br />WISHA Oo/o <br />Small Tools Oo/o <br />Warranty 0% <br />Consumables 0o/o <br />Shop Drawings <br />Total Miscellaneous Cost: <br />Total Estimated Direct Cost: <br />Profit <br />Overhead <br />Subcontractors: Total cost: <br />$ <br />lnsulation <br />0.00 <br />0.00 <br />0.00 <br />Su b-Total S ubcontractor Cost: <br />Ascent Mechanical Overhead & Profit @ <br />Total Subcontractor Cost: <br />Sub-Total: <br />lnsurance: <br />Bond: <br />(1 ,271.19) <br />(317.80) <br />$ (1,588.ee) <br />.60) <br />$ (3,687.60) <br />$ <br />$ __(5,274!9I <br />12Vo 19) <br />12o/o (633.1 e) <br />$ (6,542.s7) <br />5%$ <br />$-- <br />$ (6,542.e7) <br />0.37% $(24.21) <br />0.00% $ <br />CATTax@ 0.007o <br />TOTAL Amount:$(6,567) <br />Submitted byt_ <br />Scott Turk <br />Date:May 11 ,2026 <br />This change required time extension of <br />days. Pricing void/subjeci to revision after 5 Days <br />The costs presented in this change include only those costs which <br />can be identified at this time. No impact or delay @sts are <br />included. Should il be determined that the project is impacted at a <br />later date by multiple changes, delays or other causes, we will <br />submit those costs at that time. Work will commence upon signed <br />aeeplance by authorized representative only. <br />We assume work will start on and be <br />completed by <br />P.O. Box 38 Rathdrum, ld 83858 PH: 208-4746-6331 F: 208-687-9198
The URL can be used to link to this page
Your browser does not support the video tag.