My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Breakdown <br />Project Name: Ellensburg Rodeo Arena lmprovments RFP 08 <br />Project No. <br />Contractor: McGannElectric <br />Date: <br />Contractor Ref. No. <br />RFP.O8R <br />4t2312026 <br />Total <br />Cost <br />$ <br />$ <br />$ (4,278.00) <br />$ <br />$ <br />$ (e9.20) <br />$ <br />$('t0.92) <br />$ <br />$ (1 15.74) <br />$ <br />$ <br />$ <br />$ (805.00) <br />$(4.721 <br />$ (22.80) <br />$ (275.00) <br />s (89.50) <br />$ <br />$ 490.45 <br />$ (550.00) <br />$ (8,028.00) <br />$ <br />s <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ (13,798.43) <br />Equipment <br />Cost <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />s <br />$ <br />s <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />Unit $ <br />Material <br />Cost <br />$ <br />$ <br />$ <br />$ <br />$ <br />$(99.20) <br />$ <br />$(10.92) <br />$ <br />$ (115.74) <br />$ <br />$ <br />s <br />$ (805.00) <br />$ (14.72) <br />$Q2.80\ <br />$ (275.00) <br />$(89.50) <br />$ <br />$ 490.45 <br />$ (550.00) <br />$ (8,028.00) <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ (e,520.43) <br />Unit $ <br />-$0.62 <br />-$0.91 <br />-s19.29 <br />-$3.50 <br />-$3.68 <br />-$11.40 <br />-$0.25 <br />-$8.95 <br />$490.45 <br />-$550.00 <br />-$8,028.00 <br />Labor <br />Cost <br />$ <br />$ <br />$ (4,278.00) <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ (4.278.00) <br />$ <br />$ <br />$ <br />$ (4,278.00) <br />Unit $ <br />-$106.95 <br />Unit <br />Type <br />HR <br />FT <br />EA <br />EA <br />FT <br />EA <br />EA <br />FT <br />EA <br />EA <br />EA <br />LT <br />2t1t2017 <br />Quantity <br />40 <br />160 <br />12 <br />6 <br />230 <br />4 <br />2 <br />1 100 <br />10 <br />1 <br />1 <br />1 <br />Description <br />Electrician Labor <br />1" PVC <br />1'PVC FA <br />l" Riqid 90 <br />3/4" Riqid <br />3/4" Risid coupling <br />3/4" Riqid 90 <br />#12 thhn solid <br />Bell box <br />hand hole <br />lioht pole base <br />6 (x2) 3 (EX) <br />Labor Subtotal <br />Subtotal Cost of Work <br />reduction REVISED - Cost Breakdowl lssued4l23n026
The URL can be used to link to this page
Your browser does not support the video tag.