My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fully Executed Change Order
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Fully Executed Change Order
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2026 11:01:16 AM
Creation date
6/11/2026 10:59:53 AM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SELLAND P.O. Box 119 Wenatchee, WA 98807 <br />Phone: (509)662-7119 Fu: (509)6624465 <br />Bid Date: April 20,2026 <br />EE"-EleeattrgaL"- <br />Ellensburg Rodeo Arena lmprovements - RFP 08 COP <br />Qualifications: Please Read carefullv <br />1. Washington State sales Tax has been not been included in proposal. <br />2. Prevailing Wage has been accounted for in proposal. <br />3. Rock excavation (i.e. Solid Rock, Caliche, Hard Pan, Cemented Soils and/or Boulders larger than 1 Cubic Yard) have not been included. Price Negotiation will be <br />required if these materials are encountered. <br />4. Over Excavation of U nsuitable Material has not been accou nted for, price negotiation will be req ui red if these materials are encountered. <br />5. Excludes Water System SupPort. <br />6. Exludes Construction Survey. <br />7. Engineering & Professional 5urveying Services are Excluded. <br />8. Fees for Utilities, County, City, Etc. are not included, Cultural Resource Services are not covered in our scope. <br />9. Hazardous Materials Abatement, Removal, Handling, Disposal, etc. are not expected onsite and are therefore Excluded' <br />10. Watering & Dust Control are lncluded for Selland's scope of work and duration only. No OT Dust Control or beyond our work. <br />11. Erosion Control lnspections, Reporting, Monitoring & Maintenance are Excluded, Stormwater Permit by others. <br />12. Dust control has been provided while we are actively working the site. No permanent or sustained dust control or mitigation has been included' <br />13. Any scope of work not specifically included as a line item in this proposal is excluded. <br />14. Actual quantities installed shall be tracked/measured and the basis of payment at the unit prices included in this proposal unless otherwise agreed. <br />15. Duetoglobalsupplychaindisruptionsandmarketvolatilitywereservetheexclusiverighttoadiustourproposalformaterialescalation. <br />16. Proposalisvalidfor30days.Thisproposalshallbemadepartofanysubcontract. <br />lfyou have any questions or need additional information with regard to our proposal please give us a call. <br />Sincerely, <br />SEttAND CONSTRUCTION, INC. <br />James Flowers <br />(sos) 881-0339 <br />2,250.00 <br />175.00 <br />5o.oo <br />{1101 LF $ <br />& BF Llght Pole Bases <br />2 RFP 08 - Yard Hydrants Deduct <br />Page 1 of 1
The URL can be used to link to this page
Your browser does not support the video tag.