Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br /> Print records for all Diary and/or Cost Code Note Entries between 12/1/2025 and 3/16/2026 <br />Date Foreman Cost Code Note Index Codes <br />A Bolded Note Index Code with Asterisks Printed on: 03/16/2026 13:49:45 Page 6 <br />indicates Selection Choice <br />02/19/2026 2566 - DYLAN <br />98-021 T&M: Trench Backfill Hardscape Areas <br />0.000 <br />Slot:5 <br />Company Note: <br />Inspector Note:Started backfilling all the spoils the conduit banks trenched through the east bathroom east side 15x33 <br />Starting elevation was 1575.6 finish subgrade elevation is 1576.83 <br />02/20/2026 2566 - DYLAN <br />98-021 T&M: Trench Backfill Hardscape Areas <br />0.000 <br />Slot:5 <br />Company Note: <br />Inspector Note:Started backfilling all the spoils the conduit banks trenched through the east bathroom east side 15x33 <br />Starting elevation was 1575.6 finish subgrade elevation is 1576.83 <br />Adjusted elevation for pipe bedding to cover mainly 1- inch conduits as well as the footing edges were not backfilled since the <br />numerous electrical sleeves coming out of the cmu wall were on a separate cost code for footing backfill. <br /> Compacted area <br />02/23/2026 2566 - DYLAN <br />Attached Images/Documents <br />02/24/2026 2566 - DYLAN <br />Attached Images/Documents