My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 08_ALSC-Contractor Signed
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Change Order 08_ALSC-Contractor Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 12:29:13 PM
Creation date
5/28/2026 12:26:23 PM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br /> Print records for all Diary and/or Cost Code Note Entries between 12/1/2025 and 3/16/2026 <br />Date Foreman Cost Code Note Index Codes <br />A Bolded Note Index Code with Asterisks Printed on: 03/16/2026 13:49:45 Page 6 <br />indicates Selection Choice <br />02/19/2026 2566 - DYLAN <br />98-021 T&M: Trench Backfill Hardscape Areas <br />0.000 <br />Slot:5 <br />Company Note: <br />Inspector Note:Started backfilling all the spoils the conduit banks trenched through the east bathroom east side 15x33 <br />Starting elevation was 1575.6 finish subgrade elevation is 1576.83 <br />02/20/2026 2566 - DYLAN <br />98-021 T&M: Trench Backfill Hardscape Areas <br />0.000 <br />Slot:5 <br />Company Note: <br />Inspector Note:Started backfilling all the spoils the conduit banks trenched through the east bathroom east side 15x33 <br />Starting elevation was 1575.6 finish subgrade elevation is 1576.83 <br />Adjusted elevation for pipe bedding to cover mainly 1- inch conduits as well as the footing edges were not backfilled since the <br />numerous electrical sleeves coming out of the cmu wall were on a separate cost code for footing backfill. <br /> Compacted area <br />02/23/2026 2566 - DYLAN <br />Attached Images/Documents <br />02/24/2026 2566 - DYLAN <br />Attached Images/Documents
The URL can be used to link to this page
Your browser does not support the video tag.