My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 08_ALSC-Contractor Signed
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Change Order 08_ALSC-Contractor Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 12:29:13 PM
Creation date
5/28/2026 12:26:23 PM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br /> Print records for all Diary and/or Cost Code Note Entries between 12/1/2025 and 3/16/2026 <br />Date Foreman Cost Code Note Index Codes <br />A Bolded Note Index Code with Asterisks Printed on: 03/16/2026 13:49:44 Page 5 <br />indicates Selection Choice <br />Attached Images/Documents <br />02/12/2026 2566 - DYLAN <br />Attached Images/Documents <br />98-021 T&M: Trench Backfill Hardscape Areas <br />0.000 <br />Slot:8 <br />Company Note: <br />Inspector Note:Export of spoils pile for 109 feet of open excavation conduit bank <br />02/13/2026 2566 - DYLAN <br />98-021 T&M: Trench Backfill Hardscape Areas <br />0.000 <br />Slot:7 <br />Company Note: <br />Inspector Note:Export of unsuitable backfill materiel from the east building bathroom 109 feet of conduit trench <br />02/16/2026 2566 - DYLAN <br />Attached Images/Documents <br />98-021 T&M: Trench Backfill Hardscape Areas <br />0.000 <br />Slot:6 <br />Company Note: <br />Inspector Note:Excavate spoils out of east building utility closet sleeves that come underneath the footing and sweep up into the utility closet.
The URL can be used to link to this page
Your browser does not support the video tag.