Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-021 T&M: Trench Backfill Hardscape Ar <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 03/16/2026 13:44:28 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 11 <br />Totals by individual items: <br />Employees: <br />1136 JASON TORRES VARGAS 310 11.00 0.00 0.00 <br />2533 WILLIAM GREEN 350 / 210 / 31 12.00 1.00 0.00 <br />2541 PARKER BERMAN 310 / 210 8.75 3.50 0.00 <br />2545 JESUS LOPEZ 240 / 350 12.00 0.00 0.00 <br />2559 TUCKER SLABACH 350 / 210 5.00 0.00 0.00 <br />2566 DYLAN BROWN 310 / 810 5.50 1.00 0.00 <br />2582 RANDY RAMOS 210 7.00 0.00 0.00 <br />Totals:61.25 5.50 0.00 <br />Equipment: <br />BH335 2015 Komatsu PC138 Exc(Y 8.00 0.00 0.00 <br />BH354 2021 Komatsu PC238 Exc 8.50 0.00 0.00 <br />BH356 2021 Kubota Exc 0.50 0.00 0.00 <br />BH391 2024 Kubota Mini Excavator 2.00 0.00 0.00 <br />FB323 2024 RAM 3500 Flatbed 1.00 0.00 0.00 <br />LD363 2012 CAT 930H Loader 10.00 0.00 0.00 <br />RBH440 JOHN DEER MINI EXCAVA 6.25 0.00 0.00 <br />RLD409 950 Loader 5.50 0.00 0.00 <br />Totals:41.75 0.00 0.00 <br />Materials:Cost Type Units Received Used <br />2MFILL Fill Material Purchase & Deliv M TN 224.240 224.240