Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-021 T&M: Trench Backfill Hardscape Ar <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 03/16/2026 13:44:28 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 10 <br />Date: 02/27/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2566 DYLAN BROWN 810 0.00 0.50 0.00 <br />2545 JESUS LOPEZ 350 2.00 0.00 0.00 <br />RLD409 950 Loader 2.00 0.00 0.00 <br />1136 JASON TORRES VARGAS 310 2.00 0.00 0.00 <br />BH354 2021 Komatsu PC238 Exc 2.00 0.00 0.00 <br />Labor Totals: Hours - 4.5 <br />Equip Totals: Hours - 4.0 <br />Matl-Sub-Exp: <br />Matl-Sub-Exp Description Cost Type Units Received Used <br />2MFILL Fill Material Purchase & Deliv M TN 70.960 70.960 <br />Cost Code Notes: <br />Slot:3 <br />Company Note: <br />Indexes: <br />Inspector Note:Trench backfill in a hardscape area starting elevation of trench is 1573.5 built back up with 57 ft long 3.5 ft wide x4 ft 43.96 ton 25.86 <br />cy <br /> East Ada ramp where the water runs under the side walk down grid line 1and k to grid line 1 and h <br />Grid line f and north of grid line 1 to west of grid line d and north of grid line 1 the slab on the northside of the bar building 35ftx3.5x3.5 <br />27tn 15.88cy <br />Total cubic yards is 41.74 <br />Total tns is70.96 <br />Total Production Quantity: 81.000