My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 08_ALSC-Contractor Signed
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Change Order 08_ALSC-Contractor Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 12:29:13 PM
Creation date
5/28/2026 12:26:23 PM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br /> Print records for all Diary and/or Cost Code Note Entries between 10/6/2025 and 3/4/2026 <br />Date Foreman Cost Code Note Index Codes <br />A Bolded Note Index Code with Asterisks Printed on: 03/04/2026 18:50:27 Page 6 <br />indicates Selection Choice <br />Attached Images/Documents <br />98-005 T&M: Overexc. & Rock Placement Footings <br />0.000 TN <br />Slot:3 <br />Company Note: <br />Inspector Note:So when we were digging out the stadium continues footing between the north and west buildings the layer of soil that was a load bearing <br />approved materiel per the geo was 1-2 feet lower then most of the other areas. Which this day we had 2 6 in lifts done across the total dig <br />Two 9x9x1ft <br />40x7x1 continues footing between <br />15x7x1 <br />All footings were built with an extra foot on each side for a stable build for the footing to be built on per cascade central. We still had to add <br />materiel on the footing for the next lifts the next day. <br />Tony had time removing excess unsuitable materiel off the build area into the stockpile.1.5 hours <br />01/08/2026 2566 - DYLAN <br />Attached Images/Documents <br />98-005 T&M: Overexc. & Rock Placement Footings <br />0.000 TN <br />Slot:2 <br />Company Note: <br />Inspector Note:This was a portion of the 8x8x1 north east pad of the stage spread footing that needed to be over excavated and out with the over excavatio <br />down the continuous footing 4.5 ft wide x5 ft native load bearing soil was 1571.3
The URL can be used to link to this page
Your browser does not support the video tag.