My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 08_ALSC-Contractor Signed
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Change Order 08_ALSC-Contractor Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 12:29:13 PM
Creation date
5/28/2026 12:26:23 PM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Diary and Cost Code Notes and Indexes / Working Conditions <br /> Print records for all Diary and/or Cost Code Note Entries between 10/6/2025 and 3/4/2026 <br />Date Foreman Cost Code Note Index Codes <br />A Bolded Note Index Code with Asterisks Printed on: 03/04/2026 18:50:27 Page 5 <br />indicates Selection Choice <br />12/29/2025 2566 - DYLAN <br />98-005 T&M: Overexc. & Rock Placement Footings <br />0.000 TN <br />Slot:2 <br />Company Note: <br />Inspector Note:154 ft of the over excavated area that needed to be built back up got the second lift installed at a .5 build we ended up stretching the overb <br />from the 2 ft wide footing that we had built up at 3 feet to 3.5 feet wide to allow a stable base on the sides for a footing to be placed on witho <br />edges being scuffed off. <br />Although there was discrepancies with how hippy staked the footings out we did meet the correct elevation from top of footing with our seco <br />12/30/2025 2566 - DYLAN <br />Attached Images/Documents <br />12/30/2025 9091 - NIC LOPEZ <br />Attached Images/Documents <br />12/31/2025 2566 - DYLAN <br />Attached Images/Documents <br />01/05/2026 2566 - DYLAN <br />Attached Images/Documents <br />01/06/2026 2566 - DYLAN <br />Attached Images/Documents <br />01/07/2026 2566 - DYLAN
The URL can be used to link to this page
Your browser does not support the video tag.