My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 08_ALSC-Contractor Signed
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Change Order 08_ALSC-Contractor Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 12:29:13 PM
Creation date
5/28/2026 12:26:23 PM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-005 T&M: Overexc. & Rock Placement F TN <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 03/05/2026 11:00:50 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 4 <br />Date: 02/10/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2566 DYLAN BROWN 810 6.00 0.00 0.00 <br />RBH400 CAT 313 GC Excavator 5.00 0.00 0.00 <br />2582 RANDY RAMOS 210 5.50 0.00 0.00 <br />2533 WILLIAM GREEN 350 1.00 0.00 0.00 <br />RLD409 950 Loader 1.00 0.00 0.00 <br />Labor Totals: Hours - 12.5 <br />Equip Totals: Hours - 6.0 <br />Matl-Sub-Exp: <br />Matl-Sub-Exp Description Cost Type Units Received Used <br />2MFILL Fill Material Purchase & Deliv M TN 283.670 283.670 <br />Cost Code Notes: <br />Slot:4 <br />Company Note: <br />Indexes: <br />Inspector Note:38x 20x 2.5' soft muck area was backfilled from the over excavation the previous day <br />1574.568to 1576.670 70 cy 119.6 <br /> A second spot was at the ada west ramp was at 51'x16'x2.6' up past the stairway to the deeper overexcavation of muck. <br />1572.566 to1575.037 71.93 42.31 <br />2 separate 11x11x2.5 1571.5 bearing surface to top of exhisting grade prior to the muck spot which was 1576.5. f7 footing pads 30.47 <br />17.93 cy
The URL can be used to link to this page
Your browser does not support the video tag.