My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 08_ALSC-Contractor Signed
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Change Order 08_ALSC-Contractor Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 12:29:13 PM
Creation date
5/28/2026 12:26:23 PM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-005 T&M: Overexc. & Rock Placement F TN <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 03/05/2026 11:00:50 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 3 <br />Date: 02/09/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2566 DYLAN BROWN 810 6.00 0.00 0.00 <br />RBH400 CAT 313 GC Excavator 8.00 0.00 0.00 <br />2582 RANDY RAMOS 210 8.00 0.00 0.00 <br />2533 WILLIAM GREEN 350 8.00 0.00 0.00 <br />RLD409 950 Loader 8.00 0.00 0.00 <br />Labor Totals: Hours - 22.0 <br />Equip Totals: Hours - 16.0 <br />Matl-Sub-Exp: <br />Matl-Sub-Exp Description Cost Type Units Received Used <br />2MCSBC Base Cr M TN 113.000 113.000 <br />Cost Code Notes: <br />Slot:4 <br />Company Note: <br />Indexes: <br />Inspector Note:. The geo engineer determined The soft spots needed to be removed to build on top of <br />We had one at 65'x12' from 1574.21 back to the exhisting grade of 1576..5 this was behind the east bathrooms on the concourse deck <br />closest to the stadium wall 113tn 66.44cu yds <br />We then over excavated. A second and third muck spot in a location going out the west stairs with a cut of materiel split up into two <br />separate cut depths. <br />38x20 starting bearing surface elevation starting at 1574.568 <br />This area was at the top of the stairwell covering a surface area <br />51'x16 down to1572.566 this was at the bas of the stairwell heading out towards the west alongside the south side of the west <br />bathroom
The URL can be used to link to this page
Your browser does not support the video tag.