Laserfiche WebLink
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-005 T&M: Overexc. & Rock Placement F TN <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 03/05/2026 10:59:29 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 9 <br />Date: 01/21/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2347 ANTONIO SISCO 350 0.50 0.00 0.00 <br />LD363 2012 CAT 930H Loader 0.50 0.00 0.00 <br />2347 ANTONIO SISCO 210 0.50 0.00 0.00 <br />FB317 2023 DODGE RAM 3500 1.00 0.00 0.00 <br />2566 DYLAN BROWN 810 2.50 0.00 0.00 <br />1136 JASON TORRES VARGAS 310 0.50 0.00 0.00 <br />BH354 2021 Komatsu PC238 Exc 0.50 0.00 0.00 <br />1136 JASON TORRES VARGAS 210 1.00 0.00 0.00 <br />2582 RANDY RAMOS 210 3.00 0.00 0.00 <br />2545 JESUS LOPEZ 310 3.00 0.00 0.00 <br />BH356 2021 Kubota Exc 3.00 0.00 0.00 <br />Labor Totals: Hours - 11.0 <br />Equip Totals: Hours - 5.0 <br />Cost Code Notes: <br />Slot:1 <br />Company Note: <br />Indexes: <br />Inspector Note:Over excavated a 13x7 spread footing in the corral area and put a 1 foot lift of <br />And over excavated a continues footing of 12'x5ftx2' from 1569.5 built back up with base course to 1571.5 <br />Another crew finished over extinguished the interior pad footings in the concourse for when we do place materiel in there we already <br />have our over excavated 2 ft minimum of rock underneath the footings.