My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 08_ALSC-Contractor Signed
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Change Order 08_ALSC-Contractor Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 12:29:13 PM
Creation date
5/28/2026 12:26:23 PM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Selland Construction Prevailing <br />Job Name: Ellensburg Rodeo Arena Improvements Job Code: 2550-30 <br />Cost Code Review <br />Cost Code: 98-005 T&M: Overexc. & Rock Placement F TN <br />Code Description Class Reg. Hours OT Hours Other Hours <br />Printed on: 03/05/2026 10:59:29 <br />x__________________________________________ Date: ______________ <br />Attendance/Non-Use Codes included in Hours: None / None Page 8 <br />a 9'x9'x1' <br />Date: 01/20/2026 Foreman: 2566 Shift: 1 <br />Time Card: <br />Production Quantities: 0.000 <br />2347 ANTONIO SISCO 350 3.00 0.00 0.00 <br />LD363 2012 CAT 930H Loader 3.00 0.00 0.00 <br />2566 DYLAN BROWN 810 4.50 0.00 0.00 <br />1136 JASON TORRES VARGAS 310 3.00 0.00 0.00 <br />BH354 2021 Komatsu PC238 Exc 3.00 0.00 0.00 <br />1136 JASON TORRES VARGAS 210 4.00 0.00 0.00 <br />2582 RANDY RAMOS 210 6.50 0.00 0.00 <br />2545 JESUS LOPEZ 310 5.50 0.00 0.00 <br />BH356 2021 Kubota Exc 5.50 0.00 0.00 <br />2545 JESUS LOPEZ 210 1.00 0.00 0.00 <br />Labor Totals: Hours - 27.5 <br />Equip Totals: Hours - 11.5 <br />Cost Code Notes: <br />Slot:1 <br />Company Note: <br />Indexes: <br />Inspector Note:Excavated 3 footings that are 7x7 at 1569.5 to build back up with 1 foot of base coarse the excavations where over dug for concrete <br />form boards at 9x9 <br />For the concours area for the f12 and f7 footing call outs The geo tech requested those footings be over excavated 2 feet with an <br />approved materiel. So being so low on grade and to get the correct obvious of rock underneath the footing we are excavting footings <br />to build up rough between 10 inches we have 7 12x8 and 2 7x7 finished
The URL can be used to link to this page
Your browser does not support the video tag.