My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order 08_ALSC-Contractor Signed
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
Change Order 08_ALSC-Contractor Signed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 12:29:13 PM
Creation date
5/28/2026 12:26:23 PM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order #8 for the Ellensburg Rodeo Arena Project
Order
13
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ascent Mechanical and Plumbing Inc <br />Date:27-Apr-26 <br />COST ESTIMATE DETAIL SHEET <br />Ellensburg Rodeo Arena Improvements CHANGE PROPOSAL NUMBER: 3 <br /> <br /> <br />Contract Change Proposal <br />MAT'L UNIT COST TOTAL <br />ITEM Size DESCRIPTION QTY Unit MATERIAL LABOR MATERIAL LABOR HRS TOTAL <br />1 Chase Water Piping 1 2,098.23 5.91 2,098.23 5.91 2,098.23 <br />2 - 0.00 - <br />3 - 0.00 - <br />4 - 0.00 - <br />5 - 0.00 - <br />6 - 0.00 - <br />7 - 0.00 - <br />8 - 0.00 - <br />9 - 0.00 - <br />10 - 0.00 - <br />11 - 0.00 - <br />12 - 0.00 - <br />13 - 0.00 - <br />14 - 0.00 - <br />15 - 0.00 - <br />16 - 0.00 - <br />17 - 0.00 - <br />18 - 0.00 - <br />19 - 0.00 - <br />20 - 0.00 - <br />21 - 0.00 - <br />22 - 0.00 - <br />23 - 0.00 - <br />24 - 0.00 - <br />25 - 0.00 - <br />26 - 0.00 - <br />5.91 2,098.23$ <br />CREDIT: <br />27 - 0.00 -$ <br />28 - 0.00 - <br />29 - 0.00 - <br />30 - 0.00 - <br />31 - 0.00 - <br />0.00 -$ <br />SUBCONTRACTORS <br />32 Insulation 0 ea - 0.00 - <br />33 ea - 0.00 - <br />34 - 0.00 - <br />35 - 0.00 - <br />0.00 -$ <br />Labor Total 5.91 <br />Material Total 2,098.23$ <br />EXCLUSIONS: <br /> <br /> <br />Subcontractor Total: <br />P.O. Box 38 Rathdrum, ID 83858 <br />Page 2 of 2 <br />CONTRACTOR / NUMBER: <br />Total: <br />Chase Water Reroute
The URL can be used to link to this page
Your browser does not support the video tag.