Laserfiche WebLink
TO:Date:27-Apr-26 <br />Request No: <br />Phone:509-662-7110 Fax No: <br />Project:Our Job No.:352 <br />Our CCP No:003 <br /> T&M Cost Plus X Fixed Price <br />Scope of Work: <br />Labor Hours 5.91 hours @ 150.61$ per hour = $890.11 <br />Sick Leave 0.14775 hours @ -$ - <br />Labor Burden 222.53 <br />Insurance 0.00 hours @ -$ per hour = $- <br />Travel Time 0.00 Hr x Rate -$ per hour = - <br />Total Labor Cost:$1,112.63 <br />Materials & Supplies $- <br />Anticipated Escalation 0%- <br />Small Tools <br />Welder hours @ 40.00$ per hour = $- <br />Tool & Equipment Rentals <br />Total Material & Equipment Cost:$2,098.23 <br />Supervision Labor Costs (15% of labor) ( )0%- <br />WISHA 0%- <br />Small Tools 0%- <br />Warranty 0%- <br />Consumables 0%- <br />Shop Drawings - <br />Total Miscellaneous Cost:$- <br />Total Estimated Direct Cost:$3,210.86 <br /> Profit 12%385.30 <br /> Overhead 12%385.30 <br />Subcontractors:Total Cost:$3,981.47 <br />$ <br />- <br />- <br />- <br />- <br />Sub-Total Subcontractor Cost:$- <br />Ascent Mechanical Overhead & Profit @ 5%$- <br />5 Days Total Subcontractor Cost:$- <br />Sub-Total:$3,981.47 <br /> Insurance:0.37%$14.73 <br /> Bond:0.00%$- <br />CAT Tax @ 0.00%- <br />TOTAL Amount:$3,996 <br />and be Submitted by: <br />completed by .Scott Turk <br />Date:April 27, 2026 <br />We assume work will start on <br />Ascent Mechanical and Plumbing Inc <br />COST CHANGE PROPOSAL <br />days. Pricing void/subject to revision after <br />Estimation, Manager Review & Administrative Costs ( $108.91 / hr) <br />The costs presented in this change include only those costs which <br />can be identified at this time.No impact or delay costs are <br />included.Should it be determined that the project is impacted at a <br />later date by multiple changes,delays or other causes,we will <br />submit those costs at that time.Work will commence upon signed <br />acceptance by authorized representative only. <br />0.00 <br />Ellensburg Rodeo Arena Improvements <br />This change required time extension of <br />0.00 <br />0.00 <br />Insulation <br />509-662-6380 <br />KC Carroll <br />Cascade Central Construction <br />1285 SD. Wenatchee Ave. <br />Wenatchee, WA 99807-0119 <br />Chase Water Reroute <br />P.O. Box 38 Rathdrum, Id 83858 PH: 208-4746-6331 F: 208-687-9198