Laserfiche WebLink
BELSAAS & SMITH CONSTRUCTION <br />SHEET 1 of 2 C.O.P. #8 <br />CHANGE ORDER PROPOSAL BREAKDOWN SHEET <br /> UNIT COSTS EQUIP SUB MATERIAL LABOR <br />#DESCRIPTION QUAN.UNIT Mat.EQUIP LABOR COST COST COST COST <br />Additional Anchor Bolts + Extra Depth 72 EA 63.45 $4,568 $- <br />Original Per plans- 172 Ea versus Now- <br />244 EA <br />Labor to Templete and install- 15 Min/Ea 18 Hrs 105 $1,890 <br />Additional Rebar - Cross Ties, Piers, Ftgs <br />Materials 1 LS $5,400 <br />Labor 1 LS $3,530 <br />Additional Concrete for Ftgs/Piers <br />Additional Concrete 40 Yds 220 $8,800 <br />Carpenter Forms- 3 Men @ 12 Hrs 36 Hrs 105 $3,780 <br />Forms- Plywood-16 Sheets, 2x's-$300 1 LS 1,050 $1,050 <br />Addition Excavation <br />Operator 8 Hrs 102 $816 <br />Labor x 2 16 Hrs 69 $1,104 <br />Excavator 8 Hrs 78.00 $624 <br />*TOTALS $624 $8,930 $14,418 $7,590