My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EOC change order 2
>
Meetings
>
2026
>
06. June
>
2026-06-02 10:00 AM - Commissioners' Agenda
>
EOC change order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2026 12:26:45 PM
Creation date
5/28/2026 12:26:22 PM
Metadata
Fields
Template:
Meeting
Date
6/2/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve Change Order #2 for the New Search & Rescue/EOC Facility
Order
14
Placement
Consent Agenda
Row ID
144971
Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P.O. BOX 926 / 700 EAST MOUNTAIN VIEW AVE, SUITE 504 <br />ELLENSBURG, WA 98926 <br />O: 509-925-9747 C: 619-278-8554 <br /> scottc@belsmith.com <br />May 15, 2026 <br />Re: Building Reaction Redesign of Structural Foundations <br />Per the description below, we are pleased to offer the following change order proposal #08 <br />(COP#08). Additional cost due to redesign of the structural foundation after analysis was <br />completed on the building reactions as shown on revised S101, S501, and S502 Revision 2. This <br />cost includes: <br />1.) Additional anchor bolts required per building manufacture versus what was originally <br />shown in the contract drawings <br />2.) Additional increases in the size of the footings and piers resulting in over excavation <br />additional rebar supply/install, and additional concrete supply. <br />3.) Additional crossties on gridlines 2,3, and 4 from gridline A-D resulting in additional <br />rebar. <br />Total cost of proposal: $36,296.76 + WSST <br />Time extension required: 5 days <br />Sincerely, <br />Scott Carlson <br />Belsaas & Smith Construction
The URL can be used to link to this page
Your browser does not support the video tag.