My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2026-087 Fully Executed
>
Meetings
>
2026
>
05. May
>
2026-05-19 10:00 AM - Commissioners' Agenda
>
R2026-087 Fully Executed
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 12:15:11 PM
Creation date
5/27/2026 12:15:09 PM
Metadata
Fields
Template:
Meeting
Date
5/19/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Fully Executed Version
Supplemental fields
Item
Request to Approve a Resolution to Authorize Chair Signature on Amendment No. 3 to Professional Services Agreement with Inter-Fluve, Inc. for Lower Kittitas Reach Floodplain Reconnection Project Restoration Engineering, Design, and Permitting Services
Order
9
Placement
Consent Agenda
Row ID
144485
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMENDMENT NO. 3 <br />TO <br />PROFESSIONAL SERVICES AGREEMENT <br />WITH INTER.FLUVE, INC. <br />FOR LOWER KITTITAS REACH FLOODPLAIN RECONNECTION PROJECT <br />RESTORATION ENGINEERING, DESIGN, AND PERMTTING SERVICES <br />The terms and provisions of the Agreement for Professional Services executed on <br />September 13,2024 apply herein unless othetwise specifically revised. <br />Amendment to Project Scope <br />lnter-fluve, lnc. will assist Mid-Columbia Fisheries in the production of technical <br />specifications and typical drawings to support the revegetation plan development. <br />Amendment to Project Budget <br />The budget is increased by $108,415, from $875,769.10 to $984,184.10. The increased <br />budget includes the additionalcost needed to complete the scope of the contract and shown <br />in the budget detail in Exhibit A ($t08,335) plus an $80 discrepancy between the original <br />contract amount and the original budget exhibit. <br />Reason for Amendment: <br />Additional funding is needed to complete the project scope due to design refinements <br />necessary to ensure the project meets habitat restoration and agricultural land use <br />objectives. At the 60 percent design stage, revisions are needed to address site hydrology <br />and optimize project performance. Additionally, additional time will be needed to coordinate <br />with Mid-Columbia Fisheries on the revegetation component. <br />APPROVED <br />lnter-Fluve, lnc.ry*nty <br />Signature of Signatory <br />May 18,2026 <br />Date Date <br />Jonathon Kusa, PE, LEEP AP <br />President & CEO <br />Print Name of Signatory Print ofS <br />Professional Services Agreement Amendment No. 3 - Lower Kittitas Reach Floodplain Project <br />Page 1
The URL can be used to link to this page
Your browser does not support the video tag.