My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4_CWU Tech Transfer Agenda 20260519
>
Meetings
>
2026
>
05. May
>
2026-05-19 10:00 AM - Commissioners' Agenda
>
4_CWU Tech Transfer Agenda 20260519
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2026 12:04:51 PM
Creation date
5/14/2026 12:03:42 PM
Metadata
Fields
Template:
Meeting
Date
5/19/2026
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Item
Request to Approve a Resolution to Adopt the CWU Technology Transfer Center Feasibility Study, Capital Stacking Plan and Grant Support Documents
Order
10
Placement
Consent Agenda
Row ID
144485
Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Old Heat CERB Feasibility Study | 49 <br />309 N Pearl Street in Ellensburg, WA <br />$935,000 <br />The “Boss Bakery” building within Ellensburg’s Historic District in Central <br />Commercial (CC) city zoning presents a potential opportunity for the project. <br />Constructed in 1889, this two-story, 6,079 square foot property is a significant <br />part of Ellensburg’s original downtown fabric. Its prime location offers excellent <br />walkability, situated approximately 0.3 miles from Central Washington University <br />and less than 0.2 miles from the nearest public transit stop, enhancing its <br />accessibility. Furthermore, environmental assessments have reported no <br />significant issues. <br />However, a comprehensive evaluation reveals substantial <br />challenges that diminish its feasibility as a community building. Given its <br />designation within a historic district, any renovations or alterations, particularly to <br />the exterior, would be subject to rigorous review and approval by the Ellensburg <br />Landmarks and Design Commission. This often necessitates the preservation of <br />original elements, which can significantly increase renovation costs and extend <br />project timelines compared to non-historic properties. <br />The building’s second floor currently comprises four residential loft-style <br />apartments, requiring complete redevelopment to align with community building <br />objectives. This conversion would not only involve extensive interior demolition <br />and reconstruction but also potentially displace existing tenants, including <br />Mariposa Health and Wellness, a local business occupying the first floor, which <br />could lead to public relations and logistical complications. Moreover, the building’s <br />fixed footprint on a 0.08-acre lot offers no opportunity for expansion, limiting <br />its capacity to host large-scale community events or accommodate diverse <br />programming. <br />A critical impediment is the severe parking constraint in the immediate vicinity of <br />Pearl Street. Downtown Ellensburg consistently faces parking shortages, and this <br />property offers no dedicated on-site parking or the opportunity to create such an <br />area, a significant drawback for a facility intended to draw community members, <br />especially those traveling by vehicle. The cumulative effect of these drawbacks <br />renders this property a highly unfeasible option for a public community center.6 <br />Exhibit 8: Pear St <br />Exhibit 8: Pear St
The URL can be used to link to this page
Your browser does not support the video tag.